Browse
Search
2018-210-E Solid Waste - Draper Aden Associations long term planning scope #3
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-210-E Solid Waste - Draper Aden Associations long term planning scope #3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2019 3:35:33 PM
Creation date
6/18/2018 9:43:19 AM
Metadata
Fields
Template:
Contract
Date
6/15/2018
Contract Starting Date
3/1/2017
Contract Ending Date
2/28/2022
Contract Document Type
Contract Amendment
Amount
$4,158.00
Document Relationships
2017-097-E SW - Draper Aden Associates, Inc. for engineering and environmental services
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2017
2018-624-E Solid Waste - Draper Aden amendment 2
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2018
2018-802-E Solid Waste - Scope of Work Draper Environmental Monitoring contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2018
R 2018-210 Solid Waste - Draper Aden Associates long term planning scope
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 1 COFA69C- 6757 -43BD- 8570- E9C8F4DE644E <br />Section Two <br />Experience <br />Orange County Solid Waste Department <br />Orange County, North Carolina <br />Permitting and Design <br />Design and permit application preparation for the 70 -acre expansion of the regional landfill serving the Towns <br />of Chapel Hill, Carborro, and Hillsboro and Orange County were completed and approved by the State NCDEQ. <br />Components of the project included maximizing landfill volume, collecting and managing leachate generated <br />by the new facility, and providing detailed phasing to minimize expenditures and leachate generation. <br />Landfill Construction Management <br />Draper Aden Associates has provided construction management and QC /CQA services for the several landfill <br />construction projects as follows: <br />Eubanks Road New Subtitle D Phases 1 -3 Landfill Facility. The work encompassed a 12 -acre cell, leachate <br />holding basin, scale facilities, public use area and other facilities. <br />Eubanks Road Subtitle D Landfill Phase 4 Expansion. The work encompassed a 7 -acre cell expansion and <br />haul road extension. <br />• Eubanks Road Subtitle D Landfill Closure. The work encompassed QC testing and inspection for the 32 <br />acre closure of the facility. <br />Environmental and Groundwater Services <br />Over the years, Draper Aden Associates has successfully managed the environmental monitoring programs at <br />the Orange County Landfill and Orange County C &D Landfill, and has saved the County significant money with <br />innovative approaches and advocating on behalf of the County to NCDEQ. Our environmental monitoring <br />services have included the following: <br />Orange County Regional Landfill: North (Closed) Facility <br />• Alternate Source Demonstrations (ASDs) <br />• Assessment of Underground Injection Program Activities <br />• Corrective Action Program <br />• Groundwater Injection Program - Hydrogeochemical Assessment <br />• Semiannual Groundwater Monitoring Program <br />• Quarterly Corrective Action Monitoring Program <br />• Surface Water Monitoring Program <br />Orange County Regional Landfill: South Facility <br />• Semiannual Groundwater Monitoring Program <br />
The URL can be used to link to this page
Your browser does not support the video tag.