Browse
Search
2018-210-E Solid Waste - Draper Aden Associations long term planning scope #3
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-210-E Solid Waste - Draper Aden Associations long term planning scope #3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2019 3:35:33 PM
Creation date
6/18/2018 9:43:19 AM
Metadata
Fields
Template:
Contract
Date
6/15/2018
Contract Starting Date
3/1/2017
Contract Ending Date
2/28/2022
Contract Document Type
Contract Amendment
Amount
$4,158.00
Document Relationships
2017-097-E SW - Draper Aden Associates, Inc. for engineering and environmental services
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2017
2018-624-E Solid Waste - Draper Aden amendment 2
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2018
2018-802-E Solid Waste - Scope of Work Draper Environmental Monitoring contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2018
R 2018-210 Solid Waste - Draper Aden Associates long term planning scope
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 1COFA69C- 6757 -43BD- 8570- E9C8F4DE644E <br />Experience and /or capability may be required in any of the following subjects: <br />• Landfill Gas Management and Recovery <br />• Composting & Organics Management <br />• Groundwater Management <br />• Landfill Redevelopment <br />• Master Planning and Permitting <br />• Geotechnical Engineering <br />• Facilities Planning and Design <br />• Gas and Groundwater Remediation <br />• Quality Assurance /Quality Control <br />• Materials Handling and Recovery <br />• Regulatory Compliance <br />• Site Assessment <br />• Transfer Station Design and Construction <br />• Waste Stream Analysis and Minimization <br />• Rate Studies <br />• Risk Assessment <br />• Cost Estimating <br />• Laboratory Analysis <br />• Alternative /Emerging Technologies Assessment <br />• Solid Waste Strategic Planning <br />• Construction and Demolition debris recycling <br />• Waste and Recyclables Collection <br />Note: It is not required that a firm be experienced /capable in all of the above areas of expertise, however, <br />the successful firm may need access to this expertise through sub - contracting or other arrangements <br />as approved by County. <br />SUBMISSION REQUIREMENTS <br />PROPOSAL FORMAT <br />Orange County has achieved one of the highest verifiable waste reduction rates in the State of North <br />Carolina as calculated by the NC Waste Management Division. The 2014 -2015 reduction rate exceeds the <br />County's 61% reduction goal by 4 %. In keeping with our efforts to reduce waste at its source, we are <br />asking that respondents provide double -sided submission copies on recycled content paper, to the extent <br />practicable. <br />Each respondent is requested to submit two hard copies of your proposal and three (3) copies on CD's <br />containing the complete RFP in Adobe Acrobat format by the submittal deadline at 4:00 pm (EST), <br />Wednesday, December 7, 2016. Most of the selection team members will conduct their individual reviews <br />from the material provided on the CD, so please ensure that they are readable before they are sent and that <br />your firm's name appears on the face of the CD. <br />Engineers should submit qualifications that include the following: <br />• General information of the firm, available resources, subcontractors and range of services. <br />• Experience of the firm with similar "as needed" engineering contracts. Include references. <br />• Qualifications of the proposed Project Manager(s) and other key personnel that would most likely be <br />assigned. <br />• Geographic location of the firm (or office carrying out the work) relative to Orange County <br />• Copy of current rate sheet <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.