Browse
Search
Agenda - 06-19-2018 6-e - Memorandum of Understanding with Hillsborough and Contract for Design, Permitting, & Construction Administration for Orange County – Hillsborough Fiber Optic Network
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2018
>
Agenda - 06-19-2018 Regular Meeting
>
Agenda - 06-19-2018 6-e - Memorandum of Understanding with Hillsborough and Contract for Design, Permitting, & Construction Administration for Orange County – Hillsborough Fiber Optic Network
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2018 2:55:48 PM
Creation date
6/15/2018 3:16:32 PM
Metadata
Fields
Template:
BOCC
Date
6/19/2018
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6-e
Document Relationships
Agenda - 06-19-2018 Regular Board Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2018\Agenda - 06-19-2018 Regular Meeting
Minutes 06-19-2018
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CTC Proposal to Orange County and the Town of Hillsborough <br />April 17, 2018 <br />10 <br /> <br /> <br /> <br />Preliminary Project Timeline <br />The attached chart provides an estimated timeline for the execution of the project organized <br />according to the tasks detailed in the RFQ, spanning from design to construction phases, based <br />on our experiences with similar projects. <br />We estimate the project will require a period of approximately six months from project <br />initiation to completion of construction bid specifications, and includes estimated timeframes <br />for negotiation of necessary utility pole attachment agreements and associated make-ready <br />engineering to be performed by the utility pole owners. Actual timeframes will depend on a <br />number of factors ranging from existing utility pole conditions and congestion of underground <br />ROW, to permitting requirements and cooperation of railway owners. <br />28
The URL can be used to link to this page
Your browser does not support the video tag.