Orange County NC Website
CTC Proposal to Orange County and the Town of Hillsborough <br />April 17, 2018 <br />1 <br /> <br /> <br />Scope of Services <br />The following sections describe our proposed scope of services to accomplish the tasks detailed <br />in the RFQ. <br />A. Consulting and Design Services <br />CTC proposes to initiate this effort by requesting and reviewing pertinent information from the <br />County. We will then facilitate a kick-off meeting with the County to establish key project <br />parameters. Specific agenda items will include, but are not limited to: <br />• Review and refine the project scope of work <br />• Establish the initial project schedule based on available information <br />• Assign project points of contact and define communications protocols, including progress <br />reporting expectations and formats <br />• Review any additional available infrastructure documentation <br />• Discuss anticipated network operating model and corresponding impacts to the design <br />strategy <br />• Define technical and functional design objectives for the network <br />• Establish processes for County and Town review of engineering and permitting <br />CTC proposes to further refine the County’s system-level network design to meet its own <br />internal needs in a way that is cost-effective to deploy, and that also 1) meets critical <br />requirements for resiliency of network communications; 2) provides scalability to support the <br />varying needs of other anchor institutions within the community; and 3) can promote the <br />County’s economic develop objectives. We understand that the County have explored a range <br />of technical approaches and network architectures, and will require assistance solidifying these <br />plans before proceeding with more detailed design efforts. <br />CTC will advise the County in these matters to ensure subsequent detailed designed tasks are <br />aligned with County’s desired strategic direction. Our work will build on the strategic planning <br />and system-level design work we have performed in the past year and a half for the Town of <br />Hillsborough, so we expect that we can hit the ground running with a firm understanding of the <br />many priorities and challenges the County seeks to address with this project. <br />We understand that the requested design is limited to the physical layer of the network (conduit, <br />fiber, etc.), and does not necessarily include network electronics—but that the design must <br />consider current and emerging network technologies in developing the physical-layer network <br />19