Orange County NC Website
Commissioner Approved Fee Schedule - FY 2018-19 <br />* Any fee changes will be included in this column; <br />a blank beside each fee means there is no fee change in FY 2018-19 Commissioner Approved Fee Schedule <br />Department/Program Description Current Fee <br />Commissioner Approved <br />Fee Change for <br />FY 2018-19* <br />Last <br />Revision <br />Erosion Control Fees Erosion Control Plan Review <br /> Intense urban $507.00 per acre 2001 <br /> Urban $272.00 per acre 2001 <br /> Rural $158.00 per acre 2001 <br />Land Disturbance (Grading) Permits <br /> Intense Urban $1,241.00 per acre 2001 <br /> Urban $646.00 per acre 2001 <br /> Rural $310.00 per acre 2001 <br />Private Roads $155.00 1998 <br />Storm water Management Plans $500.00 2011 <br />Surface Water Identification (SWID) field work. <br />Stream Origin and Intermittent/Perennial <br />Determinations <br />1-2 determinations/site $200 <br />3-6 determinations/site $500 <br />7-9 determinations/site $1000 <br />10-12 determinations/site $1200 <br />13-16 determinations/site $1500 <br />17-19 determinations/site $2000 2012 <br />Infill /redevelopment <br /> Flat fee of $10,000 for projects less than 5 <br />acres. 5 acres or greater use intense urban 2011 <br />Inspection fees <br />Building Schedule A <br /> New Residential (1&2 family)$0.357/sq. ft. (all trades included)$0.394/sq. ft. (all trades included)2014 <br /> Building 0.145/sq. ft.0.160/sq. ft.2014 <br /> Electrical 0.067/sq. ft.0.074/sq. ft.2014 <br /> Plumbing 0.067/sq. ft.0.074/sq. ft.2014 <br /> Mechanical 0.078/sq. ft.0.086/sq. ft.2014 <br />Plan Review <br />0.184/sq. ft. $10.00 min. 12% surcharge for <br />Hillsborough <br />0.203/sq. ft. $25.00 min. 12% surcharge <br />for Hillsborough 2014 <br />Schedule B <br />Residential Renovations and Accessory Structures <br />(1&2 family)$0.23 per square foot 2006 <br /> Building 0.265/sq. ft.0.293/sq. ft.2014 <br /> Electrical $75.00 $83.00 2014 <br />31