Browse
Search
Agenda - 03-31-2005-7
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2005
>
Agenda - 03-31-2005
>
Agenda - 03-31-2005-7
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 5:02:45 PM
Creation date
8/29/2008 10:13:49 AM
Metadata
Fields
Template:
BOCC
Date
3/31/2005
Document Type
Agenda
Agenda Item
7
Document Relationships
Minutes - 20050331
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~- o-O5:>> i9=i~n:Cn. Nisi i Car rnoro JOnn L~ni< 9~9 969 2z~= <br />CHAPEL HILL • CARRBARO CITY SCHAOLS <br />CAPITAL INVESTMENT PLAN <br />MAJOR CAPITAL PROJECTS -PRIORITY ARDER <br />Renovations and maintenance of existing facilities to maintain safe and efficient buildings. <br />Year <br />Capital Protect <br />2005-06 Phlllips: HVAC Replacements and EMS <br />Seawall: Bathroom Heat and Hot Water <br />FP Graham: Roof Replacement <br />Kitchen AC Systems: 5 remaining schools <br />Security System Enhancements at Schools <br />Elementary School Playgrounds: 4 schools <br />FP Graham: Boiler Replacement <br />Elementary Schools Classroom Garpet Replacement <br />FP Graham: Classroom Casework <br />Phlllips: Support Area Improvements <br />Estes Hills: Campus Ganopies, Doors, Hardware <br />Seawall: Replace Windows-Classroom antl General Areas <br />Phillips: Replace W IndowsClassroom and General Areas <br />CHHS: Doors/Hardware Replacements <br />CHHS: Window Replacements <br />2006-07 CHHS: Roof Replacements - CA Bld <br />Ephesus: Update Fire Panel <br />CHHS: Electrical Upgrades and Increased Dlst. <br />Phlllips: Increase Electrical Distribution <br />Ephesus: Media Center Improvements <br />Culbrelh: Replace Windows-Classroom and General Areas <br />FP Graham: Bathroom renovations <br />Culbreth: Furniture Replacement <br />Phillips: Doors and Hardware <br />CHHS: Repair/Pave Student and Teacher lots <br />McDougle Middle: Tennis Ccurts, Basketball Goals <br />2007.08 Phlllips: Roof replacement - New W Ing/Auditorium <br />CHHS: C.A Bld. replace electric heat <br />CHHS: Cultural Arts Building-Lobby, Restroom Imp <br />Seawall: Repair/Pave Driveways and Lots <br />CHHS: Field Imp., Bleachers, Gym Flr, Field Lights <br />Culbreth:Track Resurtace, Bleachers. Gym Flaor <br />2008-09 Estes Hills: Roof Replacement <br />McDougle Middle: Roof Seals and Repairs <br />Lincoln Center: Warehouse Roof <br />Ephesus; Repair/Pave Ddveway and Lots <br />Phillips/Smith: Gym Acoustical Improvements <br />CHHS: Dance and Weight Room Floor Replacements <br />2009-10 Glenwood: Root Replacement Primary Building <br />ECHHS: Roof Seals and Repairs <br />CHHS: Replace Light FiMUres <br />Gulbreth: Doors end Hardware <br />ECHHS: Field Improvements <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.