Browse
Search
Agenda - 03-31-2005-7
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2005
>
Agenda - 03-31-2005
>
Agenda - 03-31-2005-7
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 5:02:45 PM
Creation date
8/29/2008 10:13:49 AM
Metadata
Fields
Template:
BOCC
Date
3/31/2005
Document Type
Agenda
Agenda Item
7
Document Relationships
Minutes - 20050331
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~- o-O5:t~+9GIJ.; CIS. 4ill ..zr rooro Jonn ~inH; ,c,o cso ?4,c - 3; <br />SAPFO and Facility Needs / <br />This category addresses new facilities for the District and reviews each project separately. <br />High School no 3 is projected to be bid in March of this year. Present projections have the <br />school coming in over budget, Recent school construction bids have come in higher than the <br />projected $121.01 per squaze foot projection made by the estimators in 7uly of 2004. The recent <br />Orange County Middle School came in over $130.00 per square foot.. An additional $10,00 per <br />square foot construction cost would add $ 1,622,850 to the budget, <br />Elementazy no. 10 is now scheduled to open in August 2009 and a commitment for funding has <br />been expressed by the County Commissioners and manager. With capacity calculated on the <br />basis of 23 students per class in K-3 and using SAPFO projections for growth, the elementazy <br />capacity will pass the SAPFO linrits in 2008-2009.. <br />The First School, a joint project just entering the concept phase, would be a partnership with <br />Frank Porter Graham Child Development Center for a school starting with three year olds and <br />finishing in second grade. The kindergarten, first and second grade classes would constitute half <br />a school with four projected classrooms at each grade. <br />The District still has a need for a new central office facility. Lincoln Center has outgrown its <br />capacity to house the central office administrators and workers who need to be there. When <br />Lincoln was converted to a central office in 1976, there were only 5,300 students in the District, <br />we now approach 11,000 and the number requires additional central office support, Previously <br />some central office staff could be housed in the schools and some still aze, but overcrowding at <br />the school level has forced most of those people out. In response the District is currently renting <br />three different locations to handle the overflow. The 2004-2014 CIP includes funding below the <br />line (unfunded) for a new office facility. The total included in the unfunded section is <br />$6,297,280. <br />The District has recommended the conversion of Lincoln Center back to a school function in <br />future yeazs, That would have to take place afrer a new central office is completed, Lincoln's <br />central location, in close proximity to the LTNC. campus, Franklin Street, the bus line and student <br />bearing neighborhoods, would make an excellent educational facility for students. <br />The District has experienced two years of enrollment decline at the middle school level and a <br />slowing of growth at the elementary level. Those two factors have pushed the need for new <br />middle school capacity unti12014-15. <br />The CII' should recognize the District's commitment to our older facilities and will strive to <br />keep them technologically up to date as well as providing safe and secure learning environments <br />for our students and staff. <br />Mr. Scroggs and Mr. Mullin will be present to answer any questions you may have, <br />Resolution: Be it, therefore, resolved that the Boazd of Education approves the priorities <br />for ClP projects to be forwarded to the BOCC with the above amendments <br />
The URL can be used to link to this page
Your browser does not support the video tag.