Browse
Search
Agenda - Item 8-p - Authorization for Award for Construction Manager at Risk Services for the Orange County Northern Campus Capital Project
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2018
>
Agenda - 06-19-2018
>
Agenda - Item 8-p - Authorization for Award for Construction Manager at Risk Services for the Orange County Northern Campus Capital Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2018 3:05:49 PM
Creation date
6/15/2018 2:26:35 PM
Metadata
Fields
Template:
BOCC
Date
6/19/2018
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8-p
Document Relationships
Agenda - 06-19-2018 Regular Board Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2018\Agenda - 06-19-2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />the schematic and developmental design of the project begins in earnest so as to take <br />advantage of scope and related cost information provided by the CMAR. <br /> <br />The project program is developed as a collaborative partnership (County, Designer, CMAR) <br />through a pre-construction phase process and, when pricing is ultimately agreed to by the <br />parties, it is set in writing as the Guaranteed Maximum Price (“GMP”) and becomes the basis of <br />the CMAR contract, which binds the project to the agreed upon price unless Orange County <br />changes the scope of the project in some manner. This method allows for significant, <br />collaborative cost analysis with the full benefit of the CMAR during the pre-construction phase to <br />illuminate cost-benefit factors and appropriate value engineering throughout the design. <br /> <br />Prior to the BOCC’s authorization to construct the Northern Campus, staff will present a <br />Guaranteed Maximum Price (“GMP”) (featuring several construction alternates that will assist in <br />the flexibility of the project’s construction) that the CMAR will commit to within the Agreement. <br />The projected timeline for this project is as follows: <br /> <br />Activity Estimated Date Range <br />Execution of CMAR Agreement July, 2018 <br />Staffing Analysis and Programming Options <br />Presentation to BOCC <br />October, 2018 <br /> <br />Program Completed, GMP Presentation to <br />BOCC March-May, 2019 <br />Construction Period Summer, 2019 – Summer, 2021 <br />Occupation Fall, 2021* <br /> <br />*note that the EAC and Park Operations Base may be completed and occupied prior to <br />the completion and occupation of the Detention Facility. <br /> <br />SOCIAL JUSTICE IMPACT: The following Orange County Social Justice Goals are applicable <br />for this item: <br />• GOAL: FOSTER A COMMUNITY CULTURE THAT REJECTS OPPRESSION AND <br />INEQUITY <br />The fair treatment and meaningful involvement of all people regardless of race or color; <br />religious or philosophical beliefs; sex, gender or sexual orientation; national origin or <br />ethnic background; age; military service; disability; and familial, residential or economic <br />status. <br /> <br />• GOAL: ENSURE ECONIOMIC SELF-SUFFICIENCY <br />The creation and preservation of infrastructure, policies, programs and funding necessary <br />for residents to provide shelter, food, clothing and medical care for themselves and their <br />dependents. <br /> <br />• GOAL: ENABLE FULL CIVIC PARTICIPATION <br />Ensure that Orange County residents are able to engage government through voting and <br />volunteering by eliminating disparities in participation and barriers to participation <br />2
The URL can be used to link to this page
Your browser does not support the video tag.