Browse
Search
Agenda - Item 8-a - Minutes
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2018
>
Agenda - 06-19-2018
>
Agenda - Item 8-a - Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2018 2:56:37 PM
Creation date
6/15/2018 2:20:44 PM
Metadata
Fields
Template:
BOCC
Date
6/19/2018
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8-a
Document Relationships
Agenda - 06-19-2018 Regular Board Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2018\Agenda - 06-19-2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
34 <br /> <br />rezoning to the Home Park – Conditional Zoning (“HP-CZ”) district and the standards for home 1 <br />parks in section 5.5.4 of the Unified Development Ordinance (“UDO”) will have to be met. 2 <br /> 3 <br />The Joint Planning Land Use Plan designates the area in which the parcels are located as the 4 <br />“Joint Courtesy Review Area” which means that the Towns of Chapel Hill and Carrboro must be 5 <br />provided the opportunity to review and comment upon development proposals. Final approval 6 <br />authority rests solely with Orange County. 7 <br /> 8 <br />On-site Public Well Water Supply and Wastewater Treatment Limiting Factor 9 <br />Comparison. Note Attachment 4, “Infrastructure Limiting Factor Comparison”. This summary 10 <br />provides a comparative view of the feasibility of the Millhouse Road Park site across four 11 <br />constraining factors for the development of a manufactured home park on this site: 1) 12 <br />community public well water supply; 2) subsurface septic installation; 3) innovative sewer 13 <br />treatment package installation with discharge; and 4) extending OWASA water and sewer 14 <br />services. The comparative illustration also provides estimated timelines for entitlement and 15 <br />construction as well as associated costs. 16 <br />No issues with cultural resources. 17 <br /> 18 <br />Millhouse Road Park Affordable Housing Options Feasibility Analysis 19 <br />June 5, 2018 20 <br /> 21 <br />Purpose 22 <br />• For the Board to receive a progress report on the 78 acre Millhouse Road Park site 23 <br />feasibility analysis for a potential affordable housing development; and 24 <br />• Provide feedback to the Manager and staff on the analysis and potential next steps. 25 <br /> 26 <br />Background: 27 <br /> 28 <br />• Property acquired in 2004 and 2007 for a potential soccer park in partnership with the 29 <br />Town of Chapel Hill 30 <br />• Acquisition funded with 2001 Orange County Parks and Open Space bond funds 31 <br />• Board requested feasibility study for affordable housing as an additional use to soccer 32 <br />park 33 <br />• Collaborative Feasibility Study process 34 <br />– Civil Consultants, Site-Civil Engineering and Land Planning 35 <br />– Orange County Staff: 36 <br />• County Manager’s Office 37 <br />• Asset Management Services 38 <br />• Department of Environment, Agriculture, Parks & Recreation 39 <br />• Environmental Health 40 <br />• Housing and Community Development 41 <br />• Orange County Planning 42 <br />– 3rd party consultants for environmental, cultural/archaeological, land record 43 <br />research 44 <br /> 45 <br />Aerial Site Illustration and Fact Sheet- map 46 <br /> 47 <br />Breadth of Study, General Findings 48 <br />• Land Record 49 <br />• Environmental Site Assessment 50
The URL can be used to link to this page
Your browser does not support the video tag.