Agenda - Item 6-e - Memorandum of Understanding with Hillsborough and Contract for Design, Permitting, & Construction Administration for Orange County – Hillsborough Fiber Optic Network
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2018
>
Agenda - 06-19-2018
>
Agenda - Item 6-e - Memorandum of Understanding with Hillsborough and Contract for Design, Permitting, & Construction Administration for Orange County – Hillsborough Fiber Optic Network
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2018 2:55:48 PM
Creation date
6/15/2018 2:16:15 PM
Metadata
Fields
Template:
BOCC
Date
6/19/2018
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6-e
Document Relationships
Agenda - 06-19-2018 Regular Board Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2018\Agenda - 06-19-2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />ID Name Duration Start Finish <br /> <br />37 Utility make ready coordination 100 days Mon 8/27/18 Fri 1/11/19 <br /> <br />38 Fee coordination 35 days Mon 8/27/18 Fri 10/12/18 <br />39 Joint ride‐out coordination 35 days Mon 8/27/18 Fri 10/12/18 <br />Half 2, 2018 Half 1, 2019 Half 2, 2019 <br />A M J J A S O N D J F M A M J J A S O <br />35 days <br /> <br />240 d <br />240 d <br /> <br />40 Make-ready construction 65 days Mon <br />10/15/18 <br />Fri 1/11/19 175 d <br />41 Task E: Demarc Design 25 days Mon 10/22/18 Fri 11/23/18 <br />42 Peform site surveys 10 days Mon 10/22/18 Fri 11/2/18 <br />43 Inside plant design for sites 5 days Mon 11/5/18 Fri 11/9/18 <br /> <br />44 Review design with <br />County/Town <br />5 days Mon <br />11/12/18 <br />Fri 11/16/18 <br />45 Update design 5 days Mon 11/19/18 Fri 11/23/18 <br />46 Final demarcation design 0 days Fri 11/23/18 Fri 11/23/18 <br /> <br />47 Fiber construction contractor bid <br />process (County/Town‐led) <br />50 days Wed 12/12/18 Tue 2/19/19 <br /> <br />48 Procurement process 30 days Wed 12/12/18 Tue 1/22/19 <br />49 Select contractor / negotate <br />contract <br />50 Task D: Construction <br />Management** <br />51 Review Contractor <br />documentation <br />52 Develop project plan including <br />schedule <br />20 days Wed 1/23/19 Tue 2/19/19 <br />148 days Wed 2/20/19 Fri 9/13/19 <br />5 days Wed 2/20/19 Tue 2/26/19 <br />2 days Wed 2/27/19 Thu 2/28/19 <br /> <br />Critical <br />Critical Split <br />Task <br />Split <br />Milestone <br />Slack <br />Slippage <br />Summary <br />Project Summary <br />Rolled Up Critical <br />Rolled Up Critical Split <br />Inactive Task <br />Inactive Milestone <br />Inactive Summary <br />Manual Task <br />Duration-only <br />Manual Summary Rollup <br />Manual Summary <br />Start-only <br />Finish-only <br />External Tasks <br />External Milestone <br />Deadline <br />Progress <br />32