Browse
Search
Agenda - 03-15-2005-5l
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2005
>
Agenda - 03-15-2005
>
Agenda - 03-15-2005-5l
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 6:30:56 PM
Creation date
8/29/2008 10:11:30 AM
Metadata
Fields
Template:
BOCC
Date
3/15/2005
Document Type
Agenda
Agenda Item
5l
Document Relationships
Minutes - 20050315
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2005
RES-2005-020 Orange County Transportation Priority List for 2007-2013 TIP
(Linked From)
Path:
\Board of County Commissioners\Resolutions\2000-2009\2005
RES-2005-021 Orange County Transportation Priority List for 2007-2013 TIP
(Linked From)
Path:
\Board of County Commissioners\Resolutions\2000-2009\2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment 1 <br />Comparison of Project Priority in the <br />2006-2012 Priority List and in the 2007-2013 Priority List <br />for Projects in Areas Within the <br />Durham-Chapel Hill-Carrboro Metropolitan Planning Organization <br />ORANGE COUNTY PRIORITY LIST FOR <br />2006-2012 TIP <br />PROPOSED ORANGE COUNTY P <br />LIST FOR 2007-2013 TIP <br />1. SR 1006, Orange Grove Road, at 1, SR 1006, Orange Grove Road at <br />Interstate 40: Construct a pedestrian Interstate 40: Construct a pedestrian <br />bridge over I-40. bridge over I-40. <br />2. U-2805. Homestead Road (SR 1777) <br />Improvements: Improve Homestead <br />Road from SR 1834, High School Road, <br />to NC 86. This project should include <br />bicycle and pedestrian facilities, <br />2. U-2805. Homestead Road (SR 1777) <br />Improvements: Improve Homestead Road <br />from SR 1834, High School Road, to NC <br />86, This project should include bicycle and <br />pedestrian facilities, <br />3. NC 86, Bicycle Lanes: Construct bicycle <br />lanes (4-foot paved shoulders) from <br />Chapel Hill (Whitfield Road) to <br />Hillsborough (US 70 Business). <br />4. Old NC 86 (SR 1009) Bicycle Lanes: <br />Construct bicycle lanes (4-foot paved <br />shoulders) from Carrboro (Eubanks <br />Road) to Hillsborough (I-40). <br />5, R-2825. Improvements to South Churton <br />Street: Develop congestion <br />management, limited access, aesthetic <br />and capacity improvements between US <br />70 Business and Interstate 40, <br />6. US 70 Bypass Widening: Widen, from <br />the Orange/Durham County Line to the <br />US 70 - I-85 Connector east of Efland, <br />US 70 Bypass to a four-lane divided <br />section with bike and pedestrian <br />improvements, <br />3. R-2825. Improvements to South Churton <br />Street: Develop congestion management, <br />limited access, aesthetic and capacity <br />improvements between US 70 Business <br />and Interstate 40, <br />Old NC 86 (SR 1009) Bicycle Lanes: <br />Construct bicycle lanes (4-foot paved <br />shoulders) from Carrboro (Eubanks Road) <br />to Hillsborough (I-40). <br />5, NC 86, Bicycle Lanes: Construct bicycle <br />lanes (4-foot paved shoulders) from <br />Chapel Hill (Whitfield Road) to <br />Hillsborough (US 70 Business). <br />6. NC 86 (North of Hillsborough) <br />Improvements: Widen NC 86, from US 70 <br />Bypass north of Hillsborough to SR 1332, <br />Coleman Loop, to four lanes with <br />intersection improvements at US 70 <br />Bypass to include extending the queuing <br />lane for traffic turning east onto US 70 <br />Bypass from northbound Churton <br />Street/NC 86, <br />
The URL can be used to link to this page
Your browser does not support the video tag.