Browse
Search
ORD-2018-019 UDO Text Amendment - Neighborhood information meeting requirements
OrangeCountyNC
>
Board of County Commissioners
>
Ordinances
>
Ordinance 2010-2019
>
2018
>
ORD-2018-019 UDO Text Amendment - Neighborhood information meeting requirements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2019 11:21:07 AM
Creation date
6/6/2018 3:01:27 PM
Metadata
Fields
Template:
BOCC
Date
6/5/2018
Meeting Type
Regular Meeting
Document Type
Ordinance
Agenda Item
5-a
Document Relationships
Agenda - 06-05-2018 5-a - Unified Development Ordinance (UDO) and Zoning Atlas Amendments – Modification of Neighborhood Information Meeting (NIM) Requirements
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2018\Agenda - 06-05-2018 Regular Meeting
Minutes 06-05-2018
(Attachment)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2018
Statement of Consistency - UDO Text Amendment - Neighborhood information meeting requirements
(Attachment)
Path:
\Board of County Commissioners\Various Documents\2010 - 2019\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Article 5: Uses <br />Section 5.10: Standards for Telecommunication Facilities <br />designed to function, which may be required to be determined by th <br />manufacturer's published specifications for the customer equipme <br />Q) Approval of the Planning Director to verify consistency with th efinition <br />of stealth facility is required. <br />(k) All telecommunications towers shall be placed in heavil ooded areas <br />on the site to the maximum /onopole t possible so as to I sen the visual <br />intrusiveness of the structu accessory struct es. <br />(1) No tower shall be permitted ceed its desig d loading capacity. For <br />all wireless support structurched to ex* ing structures, the <br />engineer certification statehall inclu certification that the <br />structure can support the loerimp ed from the wireless support <br />ructure. All wireless suppuctu s shall have the capacity to <br />pe it multiple users; at a onopole wireless support <br />struc res shall be structuraigned to accommodate four users and <br />self -sup rt/lattice or guyed ess support structures shall, at a <br />minimum commodate thr rs. <br />(B) General Submittal Requirem &ts — SpXcial Use Permits <br />In addition to the general submittal ' uirements detailed herein, and the specific <br />submittal requirements for all Spe I e Permit applications detailed within Section 2.7 <br />of this Ordinance, applicants sh be req *red to adhere to the following: <br />(1) Overall Policy and esired Goals <br />The overall poli and desired goals for ecial Use Permits for wireless <br />telecommunic ions support structures sha a promoting and encouraging, <br />wherever p sible, the following: <br />(a) Iternatives to constructing new wireless s port structures, including <br />but not limited to the collocation of wireless to communications <br />equipment and mitigating the visual effect of a i Bless <br />telecommunication support structure to an extent n commercially <br />impracticable; and <br />/ (b) The placement, height and quantity of wireless telecomm ications <br />towers and equipment in such a manner, including but not li ed to the <br />use of stealth technology or camouflage techniques, to minimiz adverse <br />aesthetic and visual impacts on the land, property, buildings, and er <br />facilities adjacent to, surrounding, and in generally the same area as e <br />requested location of such wireless telecommunications support <br />structure, which shall mean using the least visually and physically <br />intrusive facility that is not technologically or commercially impracticable <br />under the facts and circumstances. <br />(2) Balloon Tests <br />(a) The applicant shall, at least eeks45 days6, 7 prior to a Class B <br />Special Use Permit public hearing aador Planning Board meeting where <br />5 The balloon test required for a telecommunication facility serves 2 purposes namely: allow interested parties to <br />see a visual representation of the height of the proposed tower and the holding of a neighborhood meeting <br />allowing staff and the applicant to review the project. <br />6 References to required neighborhood meetings within the UDO are typically in days versus weeks. Staff is <br />modifying this section to ensure consistency. <br />The typical timeframe for a NIM for a Class B Special Use Permit is 45 days. Staff is proposing to modify the <br />timeframe for a balloon test for a telecommunication facilities reviewed under this process to be 45 days versus 42 <br />days (i.e. 6 weeks) for consistency purposes. <br />Orange County, North Carolina — Unified Development Ordinance Page 5 -102 <br />
The URL can be used to link to this page
Your browser does not support the video tag.