Browse
Search
ORD-2018-021 UDO Text Amendment – Home Park Conditional Zoning District (HP-CZD) Corrections
OrangeCountyNC
>
Board of County Commissioners
>
Ordinances
>
Ordinance 2010-2019
>
2018
>
ORD-2018-021 UDO Text Amendment – Home Park Conditional Zoning District (HP-CZD) Corrections
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2019 11:22:01 AM
Creation date
6/6/2018 2:52:38 PM
Metadata
Fields
Template:
BOCC
Date
6/5/2018
Meeting Type
Regular Meeting
Document Type
Ordinance
Agenda Item
5c
Document Relationships
Agenda - 06-05-2018 5-c - Unified Development Ordinance (UDO) Amendments – Home Park Conditional Zoning District (HP-CZD) Corrections
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2018\Agenda - 06-05-2018 Regular Meeting
Minutes 06-05-2018
(Attachment)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2018
Statement of Consistency - UDO Text Amendment – Home Park Conditional Zoning District (HP-CZD) Corrections
(Attachment)
Path:
\Board of County Commissioners\Various Documents\2010 - 2019\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Article 3: Base Zoning Districts <br />Section 3.8: Conditional Districts <br />5. See Section 5.5.4 for standards pertaining to Home Parks. <br />6. When a new home park is proposed to be located adjacent to an existing „ t =)i! > home park2, the Standards in Section <br />5.5.4 shall be met. <br />7. Each home space shall contain only one designated temporary or permanent residential unit. Efficiency Units are <br />prohibited within HP -CZ districts. <br />8. A Temporary Residential Unit shall be allowed within a given park for a maximum of 180 days. <br />9. All permanent residential units within a HP -CZD shall be designed and built to the appropriate State and Housing and <br />Urban Development (HUD) standards and shall be served by ermanent utility connections. <br />2 Staff is updating language to ensure consistent with previously approved changes. <br />Orange County, North Carolina — Unified Development Ordinance Page 3 -68 <br />
The URL can be used to link to this page
Your browser does not support the video tag.