Browse
Search
Agenda - 03-15-2005-10a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2005
>
Agenda - 03-15-2005
>
Agenda - 03-15-2005-10a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 6:35:21 PM
Creation date
8/29/2008 10:10:06 AM
Metadata
Fields
Template:
BOCC
Date
3/15/2005
Document Type
Agenda
Agenda Item
10a
Document Relationships
Minutes - 20050315
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3a <br />2.3. Buildine. Elevations: That the Community Design Commission approve building elevations, <br />including fencings around fields, the dog park and the recycling center, prior to issuance of a <br />Zoning Compliance Permit. <br />24. Liahtin>? Plan: That the Conununiry Design Commission approve a lighting plan for this <br />prgject prior to issuance of a Zoning Compliance Permit. <br />Stioulations Related to Environmental Issues <br />25. Land Disturbance in the Resource Conservation District: That land disturbance in the <br />Resource Conservation District is authorized in accordance with Section .3.6.:3 of the Land <br />Use Management Ordinance.. <br />26. Resource Conservation District Location: That the applicant submit Final Plans which show <br />the location of the Resource Conservation District for the off-site construction associated <br />with the sewer line extension into Southern Village. <br />27. Wetlands Location: That the applicant submit Final Plans which show the location of State or <br />federally regulated wetlands on the site or in off-site locations associated with required <br />infrastructure and roadway improvements. That any proposed disturbance of wetlands shall <br />demonstrate compliance with applicable State and federal regulations. <br />28. Irnpervious Surface Limits: That the site shall comply with Section 3.8 of the Land Use <br />Management Ordinance. <br />29. Stormwater Management Plan: That prior to the issuance of a Zoning Compliance Permit the <br />applicant shall submit a Stormwater Management Plan for review and approval by the Town <br />Manager, The plan shall be based on the 1-year, 2-year, and 25-year frequency, 24-hour <br />duration storms, where the post-development Stormwater run-off rate shall not exceed the <br />pre-development rate and the post-development Stormwater runoff volume shall not exceed <br />the pre-development volume for the local 2-year frequency, 24-hour duration storm event. <br />Engineered Stormwater facilities shall also remove 85% of total suspended solids and treat <br />the first inch of precipitation utilizing NC Division of Water Quality design standards. <br />30. Storm Draina:;eway Easement: That all stonnwater management improvements, outside <br />public right-of--way, shall be located inside reserved storm drainageway easements, in <br />accordance with Town guidelines, to be approved by the Town Manager prior to the issuance <br />of a Zoning Compliance Pernlit. <br />31. Off Site Storm Drainage/Construction Easements: That the Town Manager approve all off- <br />site construction and stornrwater easements and recorded copies of the easements be <br />submitted prior to the issuance of a Zoning Compliance Perrnit. <br />
The URL can be used to link to this page
Your browser does not support the video tag.