Browse
Search
Agenda - 03-15-2005-10a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2005
>
Agenda - 03-15-2005
>
Agenda - 03-15-2005-10a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 6:35:21 PM
Creation date
8/29/2008 10:10:06 AM
Metadata
Fields
Template:
BOCC
Date
3/15/2005
Document Type
Agenda
Agenda Item
10a
Document Relationships
Minutes - 20050315
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />8. Dogwood Acres Drive Traffic Calming Plan: That prior to the issuance of a Zoning <br />Compliance Permit, the Iown Manage shall approve a traffic calming and pedestrian <br />crossing plan for the portion of Dogwood Acres Drive within park limits, <br />9. Dogwood Acres Drive Sidewalk. That the sidewalk on the north side of Dogwood Acres <br />Drive shall be located behind the roadside ditch or constructed as a meandering sidewalk. <br />The Town's Urban Forester/Landscape Architect shall approve the field location of the <br />proposed sidewalk. <br />10. hrternal Public Street That the internal park road, between US 15-501 South and the Parlc <br />and Ride Lot, may be dedicated as public right-of--way. Prior to the issuance of a Zoning <br />Compliance Permit, the Town Manager shall approve the design and construction staz~dards <br />for this roadway, including traffic calming measures. <br />11. Sight Distance: Prior to the issuance of a Zoning Compliance Pernlit, sight distance triangles <br />at all street intersections and driveways must be approved by the Town Manager. <br />12. Pavement Marlcin~ and Street Sian Plan: Prior to the issuance of a Zoning Compliance <br />Permit, the applicant shall submit a pavement marking and street sign plan for approval by <br />the Town Manager. Street signs shall be installed for the opening of the park. <br />13. Greenway, Paths, Trails: That prior to the issuance of a Zoning Compliance Permit, the <br />Town Manager shall approve design and construction plans for the greenway, pedestrian <br />paths and trails. <br />14. Parkit~ Lot Standards: That all parking lots, drive aisles and parking spaces shall be <br />constructed to Town standards. <br />15. Bicycle Parking: That the development shall comply with the Town's Design Mazmal for <br />bicycle parking design. Mininnun number of bicycle parking spaces shall be provided as: <br />Minimum Number of Spaces 40 <br />Number of Class I Spaces 8 <br />Number of Class II Spaces 32 <br />Stioulations Related to Lazrdscaping and Architectural Issues <br />16, Required Buffers: That the following landscape buffers be provided and if any existing <br />vegetation is to be used to satisfy the buffer requirements, the vegetation shall be protected by <br />fencing from adjacent construction: <br />
The URL can be used to link to this page
Your browser does not support the video tag.