Browse
Search
2018-197-E Planning - Foster Lake and Pond Mgmt sediment control structure 3
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-197-E Planning - Foster Lake and Pond Mgmt sediment control structure 3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2018 8:54:08 AM
Creation date
6/4/2018 2:59:56 PM
Metadata
Fields
Template:
Contract
Date
6/1/2018
Contract Starting Date
6/1/2018
Contract Ending Date
8/31/2018
Contract Document Type
Agreement - Services
Amount
$9,395.00
Document Relationships
R 2018-197 Planning - Foster Lake and Pond Mgmt
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: CEOEA8D1- 92A1 -4F64- 8637- 8AEBB473EOC4 <br />Foster Lake & Pond Management, Inc. <br />9020 White Oak Road <br />Garner, NC 27529 <br />Phone: 919- 772 -8548 <br />Fax: 919- 662 -7856 <br />Email: wesley @fosterlake.com <br />To: Orange Co. Planning <br />Attachment A <br />Foster, Lake <br />f� Pond Management <br />Quotation <br />ana inspections uept. <br />Attn: Christopher Sandt, PE <br />Date <br />Quotation Number <br />Project Name <br />Orange Co. Sediment Control <br />P.O. Box 8181 <br />Hillsborough, N.C. 27278 <br />5/17/18 <br />00051718 <br />Structure #3 Trash Rack and Bent <br />Replacement <br />Description <br />Total <br />Location: Sediment Control Structure Pond #3, Hillsborough, N.C. <br />Objective: Replace trash rack; Replace bent support <br />The following services will be performed to accomplish the objective stated above: <br />Trash Rack Replacement <br />$8,060.00 <br />• The existing trash rack on the pond riser will be removed and disposed off -site. <br />• Organic debris will be removed from around the riser as much as possible by hand to facilitate <br />installation and proper drainage. <br />• A new 6' diameter, 2.5' tall aluminum trash rack will be installed (see attached picture, detail <br />under separate attachment). <br />• The top of the trash rack will have an aluminum bar grid with 6 "x6" bar spacing. <br />Bent Support Replacement <br />• The existing bent support underneath the horizontal outlet pipe (barrel) will be removed and <br />disposed off -site. <br />• A new pressure treated 8 "x8" will be installed in the same location. <br />Siphon System <br />$1,335.00 <br />• Up to two 4" siphons will be installed to lower the pond level (if required). Pond level will be <br />lowered approximately 12 -18 ". <br />Note: Siphon pricing assumes siphon status will be monitored by County staff. <br />Authorized to Proceed Foster Lake & Pond Management Inc <br />Printed Name: Wesley L. Haskins <br />See Services Agreement <br />Signature: <br />Date: 5/17/18 <br />TOTAL <br />$9,395.00 <br />This quotation is good for 45 days from the date shown above. If not authorized within 45 days, a new quotation <br />will be provided. <br />
The URL can be used to link to this page
Your browser does not support the video tag.