Browse
Search
Agenda - 06-05-2018 5-c - Unified Development Ordinance (UDO) Amendments – Home Park Conditional Zoning District (HP-CZD) Corrections
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2018
>
Agenda - 06-05-2018 Regular Meeting
>
Agenda - 06-05-2018 5-c - Unified Development Ordinance (UDO) Amendments – Home Park Conditional Zoning District (HP-CZD) Corrections
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/31/2018 4:39:23 PM
Creation date
5/31/2018 5:14:12 PM
Metadata
Fields
Template:
BOCC
Date
6/5/2018
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
5-c
Document Relationships
Agenda - 06-05-2018 Regular Board Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2018\Agenda - 06-05-2018 Regular Meeting
Minutes 06-05-2018
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2018
ORD-2018-021 UDO Text Amendment – Home Park Conditional Zoning District (HP-CZD) Corrections
(Message)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2010-2019\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Article 10: Definitions 27 <br />Section 10.1: Definitions <br />Meat Processing Facility, Community <br />A smaller scale facility where livestock or wildlife is slaughtered, processed, and packaged for personal <br />consumption and /or wholesale or retail sale. The livestock must be raised on the subject farm and from 1 <br />to 4 other cooperative farm partners. <br />Meat Processing Facility, Regional <br />A larger scale facility where livestock is slaughtered, processed, and prepared for distribution for <br />wholesale or retail sale. <br />Metal Fabrication Shop <br />A facility that is engaged in the shaping of metal and similar materials for wholesale or retail sale. <br />Microbrewery, production only <br />A facility that produces less than 15,000 barrels per year of craft malt beverages for wholesale or retail <br />sale and consumption off the premises. Shall be considered a bona fide farming use if located on a farm <br />and using primarily crops produced on -site. <br />Microbrewery with Minor Events <br />A facility that produces less than 15,000 barrels per year of craft malt beverages for consumption on- or <br />off -site with limited hours for tours of the facility and tastings of the products produced on -site, and small <br />periodic events that are expected to attract fewer than 150 people to the site. Food services may be <br />permitted under the conditional zoning or special use permit approval. <br />Microbrewery with Major Events <br />A facility that produces less than 15,000 barrels per year of craft malt beverages for consumption on- or <br />off -site with tours of the facility, tastings of the products produced on -site, and periodic events that are <br />expected to attract more than 150 people to the site. Food services may be permitted under the <br />conditional zoning or special use permit approval. <br />Mobile Home <br />A dwelling unit that: <br />a) Is not constructed in accordance with the standards of the North Carolina Uniform Residential <br />Building for One- and Two - Family Dwellings; <br />b) Is composed of one or more components, each of which is substantially assembled in a <br />manufacturing plant and designed to be transported to the home site on its own chassis for <br />placement on a temporary or semi - permanent foundation when connected to the required utilities, <br />and includes the plumbing, heating, air conditioning and electrical systems contained therein; and <br />c) Exceeds eight feet in body width and 32 feet in body length. <br />d) Is net- certified by the Secretary of the Department of Housing and Urban Development as <br />meeting applicable standards. <br />Mobile home shall also mean a double -wide mobile home and shall be considered synonymous with the <br />term manufactured home. <br />Mobile Home, Accessory <br />A subordinate structure, the use of which is customarily incidental to the permitted use of the principal <br />buildings. Accessory uses include, but are not limited to: <br />a) Storage unit, <br />b) Office, and <br />c) Classroom facility. <br />The mobile home, as an accessory structure, must not create non - conforming yards or setbacks. The <br />installation of a mobile home, as an accessory structure, is exempt from the requirements set forth herein. <br />Skirting is required, and the mobile home must be connected to the required utilities, which include the <br />plumbing, heating, air conditioning and electrical systems contained therein, provided the unit is not <br />installed for the purpose of storage. The Orange County Health Department shall determine what type of <br />sewage disposal system is appropriate. If the unit is installed for the purpose of storage, only <br />underskirting is required, connection to the required utilities (listed above) is optional. <br />Orange County, North Carolina — Unified Development Ordinance Page 10 -29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.