Orange County NC Website
Utility Infrastructure Key Factors Comparison: <br />Challenges <br />Costs <br />Entitlement /Permit <br />Process Duration <br />Site Plan and <br />Operational <br />Impacts <br />- Required flows <br />unlikely; <br />- Proximity to <br />OWASA services <br />--$45K test well; <br />- -$120K <br />design /construct <br />-2 months for test <br />well; <br />-r4 -8 months for <br />testing, permitting; <br />-well location <br />impact on site plan; <br />- ongoing operations <br />costs <br />- Inadequate soils; <br />-May need on -site <br />pre- treatment <br />lagoon; <br />- Proximity to <br />OWASA services <br />from a permitting <br />standpoint <br />Physical Unknown No <br />Feasibility <br />- Extensive <br />permitting; <br />- Proximity to <br />OWASA <br />services from a <br />permitting <br />standpoint <br />-$700K <br />design /construct; <br />- $40 -50K ann. <br />operating cost <br />-8 -14 months; <br />-6 months for <br />re- zoning after <br />design <br />- extensive <br />ongoing service <br />and reporting <br />Yes <br />- Necessary WASMPBA <br />amendments; <br />- requirement of five <br />governmental entity <br />approval <br />-r$280K <br />design /construct <br />-12 -15 months <br />WASMPBA; <br />-9 -12 months <br />permitting <br />Yes <br />