Orange County NC Website
Housing <br />Unit Development Cost Comparison: <br />14 <br />Lot Development — $2.046M — $1.838M <br />-Plan B has significantly less <br />- Earthwork <br />grading for the buildable lots due to <br />- Roadway <br />its linear design and its relationship <br />-Site Infrastructure <br />to the existing topography <br />- Stormwater <br />-Storm water design within Plan B <br />-Home Placement <br />is much less invasive regarding <br />- Permitting /Design <br />grading and site disturbance <br />-10% Contingency <br />Well /Package Sewer —$820K —$820K <br />Total -Well /Package Sewer — 2.866M — $2.658M <br />Per Lot Cost (28 lots) —$102K per lot —$95K per lot <br />OWASA Services <br />- Water /Sewer Extensions —$443K —$453K <br />- Railroad Crossing <br />Total — OWASA Services — $2.489M $2.291 M <br />Per Lot Cost (28 lots) —$89K —$82K <br />