Browse
Search
Agenda - 03-01-2005-5h
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2005
>
Agenda - 03-01-2005
>
Agenda - 03-01-2005-5h
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 2:01:45 AM
Creation date
8/29/2008 10:08:14 AM
Metadata
Fields
Template:
BOCC
Date
3/1/2005
Document Type
Agenda
Agenda Item
5h
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8 <br />Name: Bertha Hill <br />Address: 118 S. Graham St. <br />< City: Chapel Hill <br />Phone Number: Contact Kim Lassiter, Orange Co, Department on Aging at <br />245-2880 <br />Date: November 16, 2004 <br />5, Seal all cracks between the baseboard and finish floor. <br />Install carpet and pad. Carpet to cast not less than $14/yd. <br />Kitchen: <br />1. Install a six panel, metal insulated door unit with aluminum <br />threshold, and weather-stripping and matching trim. Install <br />a lockset and deadbolt to be keyed the same as the front <br />door locks. Install a wide view peephole, <br />2. Install one double insulated, vinyl replacement windows and <br />trim. Windows to have one openable sash, screens and <br />locks. <br />3. Prepare all surtaces for paint. Caulk all seams. Paint the <br />ceiling with ceiling white latex paint, the walls, trim and <br />- doors with semigloss latex paint. Paint to cover <br />completely. <br />4. Install'/4 inch lauan plywood on the floor. Prepare the <br />floor for vinyl, Caulk all seams at the baseboard. <br />5, Install vinyl floor covering and metal trim, <br />Vinyl to cost not less than $14/yd. <br />6. Install shoemold set in a bead of caulk. <br />7. Install factory made kitchen cabinets, Cabinets to have <br />hardwood fronts and a factory finish, Install six I.f. of base <br />cabinets and four 4x30 wall cabinets. <br />8. Install approx nine I,f, of square back, formica top on all base <br />cabinets. <br />Bath: <br />1, Install an ABS plastic tub enclosure with corner shelves. <br />2, Install one, 36-inch grab baron the door trim at the head <br />of the tub. <br />
The URL can be used to link to this page
Your browser does not support the video tag.