Browse
Search
Agenda - 03-01-2005-5h
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2005
>
Agenda - 03-01-2005
>
Agenda - 03-01-2005-5h
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 2:01:45 AM
Creation date
8/29/2008 10:08:14 AM
Metadata
Fields
Template:
BOCC
Date
3/1/2005
Document Type
Agenda
Agenda Item
5h
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Name: Bertha Hill <br />Address: 118 S. Graham St, <br />City: Chapel Hill <br />Phone Number: Contact Kim Lassiter, Orange Co. Department on Aging at <br />245-2880 <br />Date: November 16, 2004 <br />Exterior: <br />Remove the gutter and awnings. <br />2. Remove the asbestos siding, window and door trim, fascia <br />soffitt and window sashes. This work must be done by a <br />State Certified Abatement Contractor. <br />Replace the windowsills with likesize lumber. <br />4.. Replace window trim with likesize lumber. <br />5. Install 5/4 inch, composition board on the gable fascia and <br />'/< inch pine on the front and rear fascia. <br />6. Prepare all remaining exterior surfaces for paint., <br />Caulk all seams, Paint the crawlspace access door, <br />front porch ceiling, awnings and exterior doors with <br />semigloss latex exterior paint. <br />7.. Install vinyl siding and trim. Install aluminum coil stock <br />on the fascia, windows and door trim. Install vinyl soffitt <br />panels with a vented panel every four feet on the front and <br />rear sections of the house. <br />8, Remove all tree limbs from over the house. <br />9. Install aluminum, continuous gutter and downspouts, <br />Install plastic splash-blocks under each downspout. <br />Downspoutsto be not more or less than six inches <br />above the splashblocks. <br />10. Install two self-closing foundation vents and two <br />galvanized foundation wells on the front of the house, <br />three self-closing vents on the left side of the house, <br />two self-closing vents on the rear of the house, and three <br />self-closing vents on the right side of the house. <br />11. Install a pressure treated handrail on the front porch. <br />6 <br />12. Install a pressure treated handrail on the rear entrance. <br />
The URL can be used to link to this page
Your browser does not support the video tag.