Browse
Search
Agenda - 03-01-2005-5h
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2005
>
Agenda - 03-01-2005
>
Agenda - 03-01-2005-5h
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 2:01:45 AM
Creation date
8/29/2008 10:08:14 AM
Metadata
Fields
Template:
BOCC
Date
3/1/2005
Document Type
Agenda
Agenda Item
5h
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
24 <br />Name; Chandra Edwards <br />Address; 213 Barnes St, <br />City; Carrboro <br />Phone Number; 960-0090, 210-5824 <br />Date; December 6, 2004 <br />Exterior: <br />Install two foundation vents and galvanized foundation <br />wells on the front of the house, one foundation vent <br />and a galvanized foundation well on the left side of <br />the house, one foundation vent on the rear of the <br />house and a second vent and a galvanized foundation <br />well on the rear of the house, <br />2, Install aluminum, continuous gutter and downspouts. <br />Install plastic splash-blocks under each downspout, <br />The downspouts to be not more or less than six inches <br />from the splashblocks. <br />Roof: <br />Install a galvanized chimney cap. <br />Interior: <br />Living Room: <br />Install a vinyl over wood storm door, Door to have a <br />pneumatic closure, vinyl threshold and limited life- <br />time warranty, <br />Kitchen: <br />Install one double insulated, vinyl replacement window and <br />trim, Windows to have one openable sash, screen and <br />locks, <br />2, Install Y4 inch lauan plywood on the floor, Prepare the <br />floor for vinyl.. Caulk all seams at the baseboard.. <br />3, Install vinyl floor covering and metal trim. Vinyl to cost <br />not less than $14/yd, <br />4. Install shoemold set in a bead of caulk, <br />Install factory made kitchen cabinets, Cabinets to have <br />hardwood fronts and a factory finish. Install approx. eleven L.f, <br />of base cabinets and approx, eighteen Lf. of wall cabinets, <br />
The URL can be used to link to this page
Your browser does not support the video tag.