Browse
Search
2018-189-E AMS - OWASA licensing agreement
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-189-E AMS - OWASA licensing agreement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2018 8:50:25 AM
Creation date
5/30/2018 10:40:57 AM
Metadata
Fields
Template:
Contract
Date
5/11/2018
Contract Starting Date
5/11/2018
Contract Document Type
Agreement
Amount
$0.00
Document Relationships
R 2018-189 AMS - OWASA licensing agreement
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 454AC100- 1926- 4795- B94B- 86B8B3246CC0 <br />C ellefSYSTE S <br />10210 Statesville Blvd, Cleveland, NC 27013 Tel: 704 -27 8-2221 http : / /www.muellersystems.com <br />6 April 2018 <br />Re: OWASA AMI Meter Project <br />Mr. Jeff Thompson <br />Orange County <br />P.O. Box 8181 <br />Hillsborough, NC 27278 <br />Dear Mr. Thompson, <br />I represent Mueller Systems, the provider of Orange Water and Sewer Authority's Advancement Metering <br />Infratstructure System. This system is desigend to increase OWASA's efficiency and offer their customers <br />next generation features to better manage their water usage by reading the meters through wireless <br />technology. <br />The system will allow the residents near the Rogers Road Community Center the ability to use the OWASA <br />comumer web portal to view their hourly usage and use water smarter. To set budgets and help control <br />their water usage costs, and also to receive water usage notifications that may end up saving residents <br />money by catching leaks or usage patems that can contribute to higher bills. <br />We request the permission to mount a wireless device on the outside of the Rogers Road Community <br />Center. Mueller Systems will install the device at absolutely no cast to the county. The device is monitored <br />and maintained by Mueller Systems and will be no burden to Orange County or the buildings Tennants, <br />Mueller Systems has secured all applicable permits with the Town of Chapel Hill for the site: including the <br />wireless zoning permit and the building permit attached to this letter. This device will be installed to ensure <br />the least amount of visual clutter, and all parts will be colorized to the building to ensure the device blends <br />in to the sourrounding environment. <br />Mueller Systems will need access to the building for approximately two to three hours to complete the <br />installation, and would request that the intallation can occurduring the week of '9 April 2018 or immediately <br />following. Mueller Systems will work closely with Orange County and all building maintenance personell to <br />ensure the device is installed to the satisfactions of all stakeholders. We will scheudle the installtion and notify <br />all interested parties that the installtion is occuring, and provide as -built documetation of the final install for <br />reference. <br />Thank you for the opportunity to use this building. <br />Respectfully; <br />A IX L— '( <br />John M. Krumenacker <br />Senior Project Manager <br />Mueller Systems <br />Atiochmenis: <br />(1) Certificate of Insurance: <br />(2) Town of Chapel Hill Wireless Zoning Permit <br />(3) Town of Chapel Hill Building Permit <br />
The URL can be used to link to this page
Your browser does not support the video tag.