Orange County NC Website
DocuSign Envelope ID: 67F2FE31- BA8D- 4A7C- 967D- E2127E3BFF2A <br />F I <br />.T* N <br />Powering Business Worldwide <br />Eaton Valve Regulated (Sealed) Battery System Replacement (Update) <br />Scope of Work <br />Attachment R -11 <br />Battery replacement (update) service includes, and is expressly limited to, those tasks set forth below. <br />'Due to the size and type of battery, testing and work procedures vary between battery jars above and <br />below 100 watts per battery; work procedures may vary by UPS or related device and battery type and <br />may be limited by safety requirements. All additional work will be billable at the applicable rates per <br />Attachment X -1. <br />Performed During Installation: <br />1. New Batteries <br />a. Removal and EPA approved disposal of old batteries. <br />b. Installation utilizing proper torque values (where applicable) and verification of new <br />batteries <br />2. Visually inspect conditions and appearance of the following: <br />a. Connection terminals inter cell /battery connectors, cables and associated hardware. <br />b. Cell /battery covers, containers, and post seals. <br />c. Battery racks or cabinets and associated components and hardware. <br />d. Cell /battery jar or cover, noting any excessive distortion. <br />3. Perform cleaning of all accessible surfaces as required. <br />4. Reporting of Battery Update Visit: <br />a. The technician(s) will issue the customer a verbal report summarizing the work that was <br />performed, condition of the battery and identifying any critical issues before leaving the <br />customer's site. <br />b. A Field Activity Report containing applicable notes and observations will be sent to the <br />customer within 5 business days. <br />Eaton is a trademark of Eaton Corporation <br />Scope of Work Attachment R -11 <br />Rev. 8/11 <br />Page 1 of 1 <br />