Browse
Search
Minutes 04-26-2018 Work Session
OrangeCountyNC
>
Board of County Commissioners
>
Minutes - Approved
>
2010's
>
2018
>
Minutes 04-26-2018 Work Session
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2019 2:54:18 PM
Creation date
5/17/2018 8:13:25 AM
Metadata
Fields
Template:
BOCC
Date
4/26/2018
Meeting Type
Work Session
Document Type
Minutes
Agenda Item
5/15/18; 8-a
Document Relationships
Agenda - 04-26-2018 Regular Work Session
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2018\Agenda - 04-26-2018 Work Session
Agenda - 04-26-2018 Item 1 - Boards and Commissions – Annual Work Plans-Reports
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2018\Agenda - 04-26-2018 Work Session
Agenda - 04-26-2018 Item 2 - Environmental Impact as Part of Agenda Abstracts
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2018\Agenda - 04-26-2018 Work Session
Agenda - 04-26-2018 Item 3 - Board of Commissioners Policy on Resolutions Presented at Board Meetings
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2018\Agenda - 04-26-2018 Work Session
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
View images
View plain text
2 <br /> <br />• What are the Old NC 86 impacts? <br />o Are there Traffic Mitigating Strategies? <br />o Are there any Twin Creeks Park entrance impacts? <br />• What are the Adjacent Property impacts In terms of: <br />o Noise, Lighting, Traffic, Scenery / View Obstruction, and Water Quality? <br />• What does light-industrial really mean given that this is a designated rural residential area? <br />• How will the town manage the dual roles of developer and enforcer of this process (Land <br />Use Ordinance, etc.) since in the past, this has been separate with the town only having <br />the role of facilitator / enforcer? <br /> <br />The NTAAC recommends that prior to any development that a DOT (Department of <br />Transportation) Engineer review the area for Traffic / Safety issues. <br /> <br />Adjacent neighbors’ questions (primarily on Britton Drive, Talbryn Way, and Old NC 86): <br />1. How will increasing traffic on Old 86 be addressed? <br />2. What appropriate buffers will be provided for the adjacent properties? <br />3. Can the proposed driveway and buildings be moved towards the North side of the property? <br />4. Will bike lanes/ paths be considered? <br />5. Will light / noise/ water pollution be an issue? <br />6. How will any restrictions placed on the property be enforced? <br />7. How will the property make financial sense for the town/ county? <br />8. Who will pay for the development of the project? <br />9. What is the meaning of "transition area" (the current designation) given this proposal? <br />10. Would greenhouses be considered for the property? <br /> <br />Traffic Along Old NC 86 and Eubanks Roads Remain Problematic: <br />Traffic along Old NC 86 and Eubanks Road remains problematic for Northern Transitional Area <br />(NTA) residents. <br />• On school mornings, traffic backs up on Eubanks by Morris Grove since the traffic circle <br />does not have a dedicated right turn lane into the school. <br />• During weekday mornings, residents can no longer safely make a left turn onto Old NC <br />86 on the stretch of Old NC 86 from Calvander to Eubanks given the amount of cross <br />traffic on Old NC 86. <br />We’ve recently given a report to the BoA (11/14/2017) which included our concerns and <br />recommendations for mitigating traffic. Unfortunately, though the area continues to be <br />developed, the DOT has not implemented any road infrastructure improvements. On a positive <br />note, it appears that a traffic study was conducted last November (2017) but unfortunately the <br />DOT is unfamiliar with this. Does the County have any information since the collector sites were <br />on Old NC 86, Martin Luther King Jr. Boulevard, and within the towns of Carrboro and Chapel <br />Hill? <br /> <br />North-South Connector Road via Lake Hogan Farms Extension Remains Stalled: <br />For many years, the NTAAC has championed completing the North-South Connector Road, <br />using Lake Hogan Road Extension, northward to Eubanks Road and Morris Grove School, as a <br />solution to traffic and safety issues. This connector road would provide an alternate route to Old <br />NC 86 as well as improve traffic circulation and safety for the surrounding area including Hogan <br />Farms and the future Twin Creeks Park. We recently received an update from the Carrboro <br />Planning Staff who confirm the project is stalled since Ballentine (MI Homes) has not proceeded
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).