Browse
Search
2018-160-E Solid Waste - WL Bishop Construction break room renovations
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-160-E Solid Waste - WL Bishop Construction break room renovations
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2018 5:21:16 PM
Creation date
5/14/2018 12:34:08 PM
Metadata
Fields
Template:
Contract
Date
5/10/2018
Contract Starting Date
5/9/2018
Contract Ending Date
6/30/2018
Contract Document Type
Agreement - Construction
Amount
$25,254.00
Document Relationships
R 2018-160 Solid Waste - breakroom renovations
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 9FAC751D -4B6F- 458E- 82B1- 8BD3AF6AB3C1 <br />Orange County Solid Waste Administration — Eubanks Road Convenience Center Renovation <br />Attendant Breakroom Bathroom Addition Scope of Work <br />Install one 36" steel exterior door in West wall of breakroom. <br />Plumb water and sewer to new toilet fixture and sink. All exposed water pipe to be insulated, both <br />inside and outside to prevent freezing. <br />Install a floor cleanout in the bathroom, as shown on the attached drawing. <br />Construct new 4" interior sheetrock walls to create new 5'0" x 5'9" (interior dimensions) bathroom. <br />Install passive vents in new wall to allow heated and cooled air to flow into bathroom area. <br />Finish walls — mud, sand and prime new sheetrock walls, install trim to match existing. <br />Install plumbing fixtures and mechanical equipment as listed on plan sheet provided using the <br />manufacturer and model number specified, or equal. Any substitutions will need to be submitted for <br />approval prior to installation. <br />Provide any electrical wiring and install circuits in the existing panel necessary to install lights, fan, water <br />heater, outlets or other equipment to be installed. <br />Install a timer switch for the bathroom light /fan just inside the entrance <br />Install new vinyl flooring in bathroom. Provide color options to owner prior to installation. <br />Install step or steps as necessary for entry to bathroom and main entrance <br />Other Building Upgrade Options <br />Please price the following add alternates individually. If accepted, these alternates will be considered <br />part of the overall project and completed in the same timeframe. <br />1. Install 6'x 12' wooden front porch with shed roof <br />2. Install new tan - colored metal roof on entire building <br />3. Install new vinyl siding and trim <br />4. Install new rain gutters and downspouts <br />Please see attached plan sheet for more details and contact Kevin Lindley at 919 - 918 -4915 with any <br />questions. <br />
The URL can be used to link to this page
Your browser does not support the video tag.