Orange County NC Website
DocuSign Envelope ID: 72E7BD50- E5C5- 4BEA- B4AA- FCA907469BF8 <br />n <br />s <br />\ 4l <br />0 <br />"S/1' MORE, <br />15,76 <br />614 -_ IC- <br />I < <br />�/ 1 Y AMORE `1 .115 MQTLE _ \ � � � � \ � �O <br />/ / � \� \ _ In EXISTING 15 -25% SLOPES <br />/114- MAPLEI <br />/15-WILLOW l OA c I 1 <br />1�'ISNCAMORE/ / / I I I I ,off T EE PR❑TECTI ❑N ✓ `" <br />FENCING <br />o o I,�� _6e6 <br />14-SYCAMORE / 1/ emWr / / // I I i �`= 622`\ <br />mm? / / I 1\ <br />A // / I / SD / cn <br />SITE BENCHMARK / / / ' <br />MANN17LE RIM / / / // SD / I ti / / �� SD <br />ELEV= 616,25 / / / / / SD <br />SAM- <br />p° F <br />G <br />LIMITS ❑ / <br />DISTURBANC <br />QJ <br />G / \ <br />N OTES <br />CRETE WASH <br />\/ // ' 2 / I I <br />o <br />Q C5. SILT FENCE l <br />m <br />H START OF DITCH <br />ELEV: 624 <br />p <br />+) <br />GENERAL NOTES: <br />1. TOPOGRAPHIC SURVEY INFORMATION PROVIDED BY SURVEYING SOLUTIONS, P.C., DATED FEBRUARY 13, 2017 YOUNGSVILLE, <br />NC PHONE: 919 - 854 -4833 <br />2. PRIOR TO BIDDING ON WORK AT THE SITE, THE CONTRACTOR SHALL VISIT THE SITE TO FIELD VERIFY THE EXISTING <br />CONDITIONS. <br />3. PRIOR TO START OF WORK CONTRACTOR SHALL MEET WITH OWNER, ARCHITECT, & ENGINEER FOR A PRE - CONSTRUCTION <br />MEETING. <br />Okay <br />Skimmer Basin #1 <br />4. <br />NO WORK SHALL TAKE PLACE ON THE SITE UNTIL THE CONTRACTOR HAS CONTACTED NORTH CAROLINA ONE -CALL CENTER <br />4.55 <br />Peak Flow from 10 -year Storm (cfs) <br />7 days <br />AND THE TOWN OF CHAPEL HILL TO LOCATE UTILITIES. <br />14 days <br />14 days <br />5. <br />ANY INTERRUPTION OF UTILITY SERVICE SHALL BE APPROVED AT LEAST 48 HOURS PRIOR TO WORK IN THAT AREA. <br />14 days <br />088 Bottom Area ft` <br />6. <br />ANY SIGNIFICANT CHANGES IN ACTUAL SITE CONDITIONS FROM THOSE SHOWN ON THE PLANS SHALL BE BROUGHT TO THE <br />6355 Actual Volume ft Okay <br />3 <br />DROP INLET <br />ATTENTION OF THE ENGINEER OF RECORD. <br />5004 <br />Required Volume ft <br />7. <br />ALL EXISTING WALKS, PAVEMENT, CURB, ETC. WHICH ARE DAMAGED DURING CONSTRUCTION SHALL BE REPAIRED TO MATCH <br />1478 <br />Required Surface Area ft <br />EXISTING CONDITIONS. <br />6.36 Spillway Capacity cfs Okay <br />8. <br />ALL EXISTING FENCING, PAVEMENT, ETC. THAT IS REMOVED BY THE CONTRACTOR SHALL BE DISPOSED OF PROPERLY. <br />27 <br />Suggested Width ft <br />9. <br />PROVIDE POSITIVE DRAINAGE AWAY FROM NEW AND EXISTING BUILDINGS. <br />i 54 <br />Suggested Length ft <br />10. <br />CONTRACTOR STAGING AREAS SHALL BE RETURNED TO ORIGINAL CONDITION AT THE COMPLETION OF ALL WORK. <br />Dewateri ng Time (days) Okay} <br />TEMPORARY 4 <br />11. <br />RESEED ALL DISTURBED AREAS AT COMPLETION OF ALL WORK. <br />C❑NSTRUCTI ❑N C5. <br />SKIMMER HEAD <br />12. <br />ADJUST ALL EXISTING & NEW UTILITIES TO BE FLUSH WITH FINISHED GRADES, TYPICAL. <br />41 <br />Trial Top Width at Spillway Invertft <br />13. <br />USE PAVEMENT PATCHING DETAIL FOR ALL UTILITY CUTS THROUGH EXISTING ASPHALT. <br />t� <br />14. <br />SAWCUT EXISTING ASPHALT ADJACENT TO PAVEMENT PATCHING. <br />56 <br />Trial Top Length at Spillway InVertft <br />15. <br />NO WATERCOURSE OR 100 -YEAR FLOOD PLAIN AS MAPPED BY F.E.M.A. OR AS DEFINED BY ANY FEDERAL, STATE, OR <br />2 <br />Trial Side Slope Ratio Z:1 <br />LOCAL AUTHORITY IS LOCATED ON THIS SITE. <br />ILT FENCE <br />� 1 � <br />❑IL STOCKPILE AREA <br />T CNpOR D <br />qRY <br />SIB T DITCH <br />� ll/ <br />// / / \ \ \ \ / LIMITS OF <br />/ <br />TART / / / 1 DISTURBANCE ` \ /6 ELEV 62 DITCH <br />®oil <br />�0 UFFER\ I INLET PR❑TECTI ❑N <br />EIG <br />6 <br />o bs\ \\ INLET PRI <br />608 <br />SENIOR CENTER \ <br />ADDITION \ <br />FIFE. = 619.09 v 3 <br />SILT E N C E <br />NEW BUILDING <br />22,400 SF <br />F. F. E.I6' <br />BASIN INLET @ <br />SLOPE DRAIN <br />�\ a 16 ELEV: 621 <br />® ® EMP❑RARY <br />SL E DRAIN <br />TEMPORARY <br />DIVERSI ❑N <br />DITCH <br />A11111110, <br />i <br />#5 <br />ITECTI ❑N <br />7 � <br />i <br />2. HOLD THE PRE - CONSTRUCTION MEETING WITH ENGINEER OF REC RD <br />AND STATE INSPECTOR. PROVIDE ESC COORDINATOR'S NAME AND PHONE <br />NUMBER TO NCDEQ AND ENGINEER OF RECORD. <br />3. THE SITE SHALL BE INSPECTED, AT A MINIMUM, WEEKLY AND F LOWING <br />SIGNIFICANT RAINS OF 0.5 " /24HOURS OR GREATER. REPORTS ALL BE <br />GENERATED FOR ALL INSPECTIONS AND ACTIONS USING STORMWA R <br />INSPECTION FORM NCGO10000 -LAND DISTURBING ACTIVITIES. <br />4. GRADE AND INSTALL CONSTRUCTION ENTRANCE(S). <br />5. INSTALL PERIMETER PROTECTION (SILT FENCE, TREE PROTECTION, IN ET <br />PROTECTION, ETC.) <br />6. CLEAR ENOUGH AREA TO INSTALL THE SEDIMENT BASIN. <br />QQ 7. INSTALL THE DIVERSION DITCHES IMMEDIATELY AFTER SEDIMENT BA N IS <br />LIMITS F CONSTRUCTED. INSTALL MATTING IN DITCHES AS PER DETAIL (17/C5. ) <br />! U CE 8. SEDIMENT BASIN AND DIVERSION DITCHES ARE TO BE STABILIZED <br />N-I SILT FENCE IMMEDIATELY. <br />9. INSTALL NEW STORM DRAINAGE PIPE BETWEEN #5 - #4 - #3 USING PIP <br />PROTECTION DETAIL, INSTALL ALL OUTLET PROTECTION <br />'GU DEVICES /APRONS, AND INSTALL INLET PROTECTION AROUND EXISTI <br />hv. - AND NEW STRUCTURES. <br />23'OAK 10. GRADE AND STABILIZE BUILDING PAD, CONSTRUCTION ROADS, AND <br />PARKING AREAS. <br />UM 11. MAINTAIN EROSION CONTROL MEASURES IN ACCORDANCE WITH NCDEQ <br />STANDARDS AND MANUFACTURER'S RECOMMENDATIONS. <br />"l 7 12. INSPECT AND MAINTAIN ALL SEDIMENT & EROSION CONTROL MEAS ES <br />1 o AFTER EACH 1/2" OR GREATER STORM EVENT. <br />! 24194 13. ALL SEDIMENT MUST BE CLEANED UP USING DRY METHODS (IE NO <br />WASHING SEDIMENT OFF ROADWAYS) <br />14. COVER ALL AREAS THAT WILL BE UNWORKED FOR MORE THAN SEVEN <br />BASIN INLET DAYS WITH STRAW, WOOD FIBER MULCH, COMPOST, PLASTIC SHEETING <br />SLOPE DRAIN 1 <br />ELEV, 621 TREE P R ❑ T E C T I ❑ N OR EQUIVALENT. ALSO, COVER AREAS BEFORE MAJOR STORM EVENTS <br />FENCING 15. STABILIZE ALL AREAS WITHIN 7 DAYS OF REACHING FINAL GRADE. <br />: , a 16. INACTIVE AREAS SHALL BE STABILIZED /PROVIDED WITH GROUND COVER <br />® nl 1 WITHIN 7 DAYS. <br />o TEMP ❑BABY C3 17 OR SOD ANY AREAS TO REMAIN UNWORKED FOR MORE THAN 14 <br />DAYS. <br />� • _ I O'GUM <br />NE::: SLOPE DRAIN 16 18. AFTER COMPLETION OF THE NEW BUILDING, REMOVE THE TEMPORARY <br />rj CONSTRUCTION OFFICE AND ALL ON SITE STAGING. BUILDING ROOF D IN <br />B WILL BE CONNECTED TO THE DITCH ABOVE SEDIMENT BASIN #1. <br />19. CONSTRUCT NEW OUTDOOR ATHLETIC FIELD AND UNDERDRAIN AND TIE <br />STORM DRAINAGE TO DITCH ALONG EAST SIDE OF THE SITE. <br />4 20. UPON COMPLETION OF THE PROJECT, STABILIZE ALL DISTURBED AREAS <br />�3 1 %gum SKIMMER TO AND REQUEST INSPECTION FROM ENGINEER OF RECORD. REMOVE <br />INLET #3 TEMPORARY DEVICES UPON ENGINEERS APPROVAL. CONTRACTOR IS <br />RESPONSIBLE FOR ALL INSTALLATION, MAINTENANCE, AND REMOVAL 0 <br />THESE SYSTEMS. <br />\ EDIMENT BASIN #1 C5 21. SEDIMENT BASIN SHALL BE DEWATERED THROUGH A FILTER BAG, DETAIL <br />I (17/C5.1). DEWATERING DIRECTLY TO STORM DRAINS IS PROHIBITED. <br />22. RESEED ALL DISTURBED AREAS. <br />BAFFLES 15 23. COMPLETE BIORETENTION AREA CONVERSION AND INSTALLATION OF W <br />ROADWAY AT SOUTHEAST END OF THE BUILDING. SEE SHEET 3.1 FOR <br />CS• SPECIFIC REQUIREMENTS OF THE NEW RAIN GARDEN. <br />C /`_1� EROSION CONTROL CONSTRUCTION <br />SPILLWAY FOR SEDIMENT <br />BASIN -TARP ON SURFACE <br />/ \ SILT FENCE 2 <br />� C5. <br />\ \ <br />SF o <br />POND - <br />10\� \\ <br />\ -- <br />606 <br />\\ \\ o <br />MALE <br />\ _ e 14 GUM <br />R❑SI ❑N CONTROL NOTES: \ <br />_)0' ` UFFER\ \ \ <br />NEUSE RIVER BASIN, RIPARIAN BUFFER ALONG POND SF❑ S FENCE \ \ \ \ ®1%�/ <br />• ED DI URBE AREAS WITHIN LIMITS OF CTI ❑N <br />THA LL Al I ❑ THE GROUND <br />0 6 15'GUM / <br />COVER REQUIREMENTS FOR SLOPE C❑NDITI ❑NS CHART BELOW 012GUM 01 - 604 - -- �j' <br />F ❑LL ❑WING SURFACE STABILIZATI ❑N DETAILS (6-9/C5,2), _� 121GUM .1 <br />• WHEN THE TEMPORARY SEDIMENT BASIN IS TO BE <br />DECOMMISSIONED, DRAIN ALL REMAINING WATER THROUGH A 11 \ 1 ®ELM <br />FILTER BAG; SEE DETAIL (17/C5,1), `� -� \'GUM 14-GUM <br />1 � 14 MA E <br />• PERIMETER SILT FENCE SHALL REMAIN IN PLACE UNTIL 600 / 13'GUM <br />FINAL STABILIZATI ❑N HAS BEEN ACHIEVED X) <br />SELF INSPECTION FORMS CAN BE OBTAINED AT 2'MAPLE- J ply, <br />http / /deq nc,gov /about /dlvlslons /energy- mineral,-land- � � 12GUM Gull- <br />resource <br />s /erosion - sediment- control /-Forms ° ° <br />• PR ❑VIDE ADDITIONAL ER❑SI ❑N AND SEDIMENTATI ❑N CONTROL - <br />MEASURES AS NECESSARY /REQUIRED IN ORDER TO PROTECT _ / - - <br />ALL PUBLIC AND PRIVATE PROPERTY FROM DAMAGE, <br />• PR ❑VIDE RAIN GAUGE ON SITE - -- -- -- -- - %'% <br />`LIMITS OF <br />DISTURBANCE <br />F❑ , <br />So' or greater <br />s <br />a <br />'^ I 10` or less <br />1717 <br />IV <br />Ground Cover Requirements for <br />Slope Conditions <br />7 days <br />7 days <br />4 Trial Depth ft (2 to 3.5 feet above grade) <br />14 days <br />7 days <br />25 Bottom Width ft <br />14 days <br />14 days <br />40 Bottom Length ft <br />14 days <br />14 days <br />088 Bottom Area ft` <br />60•- <br />2' CONTOUR <br />6355 Actual Volume ft Okay <br />DROP INLET <br />2276 Actual Surface Area ft` Okay <br />STORM DRAINAGE LINE <br />6.00 Trial Weir Length ft <br />TREE PR❑TECTI ❑N FENCE <br />0.50 Trial Depth of Flow ft <br />DITCH LINE <br />6.36 Spillway Capacity cfs Okay <br />SILT FENCE <br />6.00 Skimmer Size (inches) <br />INLET PR❑TECTI ❑N <br />0.42 Head on Skimmer (feet) <br />DIVERSI ❑N DITCH <br />1.25 Orifice Size (1/4 inch increments) <br />C❑NSTRUCTI ❑N ENTRANCE <br />Dewateri ng Time (days) Okay} <br />TEMPORARY 4 <br />SILT FENCE OUTLET <br />water sh -5 da s <br />C❑NSTRUCTI ❑N C5. <br />SKIMMER HEAD <br />ENTRANCE <br />EROSION CONTROL CONSTRUCTION SEQUENCE <br />❑NCRETE <br />t�WASHOUT <br />ALL WORK SHALL CONFORM TO NCDEQ REQUIREMENTS. <br />1. NOTIFY DEMLR REGIONAL OFFICE AT LEAST 48 HOURS PRIO TO <br />COMMENCING THE LAND DISTURBING ACTIVITY AT 919 - 791 -42 <br />2. HOLD THE PRE - CONSTRUCTION MEETING WITH ENGINEER OF REC RD <br />AND STATE INSPECTOR. PROVIDE ESC COORDINATOR'S NAME AND PHONE <br />NUMBER TO NCDEQ AND ENGINEER OF RECORD. <br />3. THE SITE SHALL BE INSPECTED, AT A MINIMUM, WEEKLY AND F LOWING <br />SIGNIFICANT RAINS OF 0.5 " /24HOURS OR GREATER. REPORTS ALL BE <br />GENERATED FOR ALL INSPECTIONS AND ACTIONS USING STORMWA R <br />INSPECTION FORM NCGO10000 -LAND DISTURBING ACTIVITIES. <br />4. GRADE AND INSTALL CONSTRUCTION ENTRANCE(S). <br />5. INSTALL PERIMETER PROTECTION (SILT FENCE, TREE PROTECTION, IN ET <br />PROTECTION, ETC.) <br />6. CLEAR ENOUGH AREA TO INSTALL THE SEDIMENT BASIN. <br />QQ 7. INSTALL THE DIVERSION DITCHES IMMEDIATELY AFTER SEDIMENT BA N IS <br />LIMITS F CONSTRUCTED. INSTALL MATTING IN DITCHES AS PER DETAIL (17/C5. ) <br />! U CE 8. SEDIMENT BASIN AND DIVERSION DITCHES ARE TO BE STABILIZED <br />N-I SILT FENCE IMMEDIATELY. <br />9. INSTALL NEW STORM DRAINAGE PIPE BETWEEN #5 - #4 - #3 USING PIP <br />PROTECTION DETAIL, INSTALL ALL OUTLET PROTECTION <br />'GU DEVICES /APRONS, AND INSTALL INLET PROTECTION AROUND EXISTI <br />hv. - AND NEW STRUCTURES. <br />23'OAK 10. GRADE AND STABILIZE BUILDING PAD, CONSTRUCTION ROADS, AND <br />PARKING AREAS. <br />UM 11. MAINTAIN EROSION CONTROL MEASURES IN ACCORDANCE WITH NCDEQ <br />STANDARDS AND MANUFACTURER'S RECOMMENDATIONS. <br />"l 7 12. INSPECT AND MAINTAIN ALL SEDIMENT & EROSION CONTROL MEAS ES <br />1 o AFTER EACH 1/2" OR GREATER STORM EVENT. <br />! 24194 13. ALL SEDIMENT MUST BE CLEANED UP USING DRY METHODS (IE NO <br />WASHING SEDIMENT OFF ROADWAYS) <br />14. COVER ALL AREAS THAT WILL BE UNWORKED FOR MORE THAN SEVEN <br />BASIN INLET DAYS WITH STRAW, WOOD FIBER MULCH, COMPOST, PLASTIC SHEETING <br />SLOPE DRAIN 1 <br />ELEV, 621 TREE P R ❑ T E C T I ❑ N OR EQUIVALENT. ALSO, COVER AREAS BEFORE MAJOR STORM EVENTS <br />FENCING 15. STABILIZE ALL AREAS WITHIN 7 DAYS OF REACHING FINAL GRADE. <br />: , a 16. INACTIVE AREAS SHALL BE STABILIZED /PROVIDED WITH GROUND COVER <br />® nl 1 WITHIN 7 DAYS. <br />o TEMP ❑BABY C3 17 OR SOD ANY AREAS TO REMAIN UNWORKED FOR MORE THAN 14 <br />DAYS. <br />� • _ I O'GUM <br />NE::: SLOPE DRAIN 16 18. AFTER COMPLETION OF THE NEW BUILDING, REMOVE THE TEMPORARY <br />rj CONSTRUCTION OFFICE AND ALL ON SITE STAGING. BUILDING ROOF D IN <br />B WILL BE CONNECTED TO THE DITCH ABOVE SEDIMENT BASIN #1. <br />19. CONSTRUCT NEW OUTDOOR ATHLETIC FIELD AND UNDERDRAIN AND TIE <br />STORM DRAINAGE TO DITCH ALONG EAST SIDE OF THE SITE. <br />4 20. UPON COMPLETION OF THE PROJECT, STABILIZE ALL DISTURBED AREAS <br />�3 1 %gum SKIMMER TO AND REQUEST INSPECTION FROM ENGINEER OF RECORD. REMOVE <br />INLET #3 TEMPORARY DEVICES UPON ENGINEERS APPROVAL. CONTRACTOR IS <br />RESPONSIBLE FOR ALL INSTALLATION, MAINTENANCE, AND REMOVAL 0 <br />THESE SYSTEMS. <br />\ EDIMENT BASIN #1 C5 21. SEDIMENT BASIN SHALL BE DEWATERED THROUGH A FILTER BAG, DETAIL <br />I (17/C5.1). DEWATERING DIRECTLY TO STORM DRAINS IS PROHIBITED. <br />22. RESEED ALL DISTURBED AREAS. <br />BAFFLES 15 23. COMPLETE BIORETENTION AREA CONVERSION AND INSTALLATION OF W <br />ROADWAY AT SOUTHEAST END OF THE BUILDING. SEE SHEET 3.1 FOR <br />CS• SPECIFIC REQUIREMENTS OF THE NEW RAIN GARDEN. <br />C /`_1� EROSION CONTROL CONSTRUCTION <br />SPILLWAY FOR SEDIMENT <br />BASIN -TARP ON SURFACE <br />/ \ SILT FENCE 2 <br />� C5. <br />\ \ <br />SF o <br />POND - <br />10\� \\ <br />\ -- <br />606 <br />\\ \\ o <br />MALE <br />\ _ e 14 GUM <br />R❑SI ❑N CONTROL NOTES: \ <br />_)0' ` UFFER\ \ \ <br />NEUSE RIVER BASIN, RIPARIAN BUFFER ALONG POND SF❑ S FENCE \ \ \ \ ®1%�/ <br />• ED DI URBE AREAS WITHIN LIMITS OF CTI ❑N <br />THA LL Al I ❑ THE GROUND <br />0 6 15'GUM / <br />COVER REQUIREMENTS FOR SLOPE C❑NDITI ❑NS CHART BELOW 012GUM 01 - 604 - -- �j' <br />F ❑LL ❑WING SURFACE STABILIZATI ❑N DETAILS (6-9/C5,2), _� 121GUM .1 <br />• WHEN THE TEMPORARY SEDIMENT BASIN IS TO BE <br />DECOMMISSIONED, DRAIN ALL REMAINING WATER THROUGH A 11 \ 1 ®ELM <br />FILTER BAG; SEE DETAIL (17/C5,1), `� -� \'GUM 14-GUM <br />1 � 14 MA E <br />• PERIMETER SILT FENCE SHALL REMAIN IN PLACE UNTIL 600 / 13'GUM <br />FINAL STABILIZATI ❑N HAS BEEN ACHIEVED X) <br />SELF INSPECTION FORMS CAN BE OBTAINED AT 2'MAPLE- J ply, <br />http / /deq nc,gov /about /dlvlslons /energy- mineral,-land- � � 12GUM Gull- <br />resource <br />s /erosion - sediment- control /-Forms ° ° <br />• PR ❑VIDE ADDITIONAL ER❑SI ❑N AND SEDIMENTATI ❑N CONTROL - <br />MEASURES AS NECESSARY /REQUIRED IN ORDER TO PROTECT _ / - - <br />ALL PUBLIC AND PRIVATE PROPERTY FROM DAMAGE, <br />• PR ❑VIDE RAIN GAUGE ON SITE - -- -- -- -- - %'% <br />`LIMITS OF <br />DISTURBANCE <br />F❑ , <br />So' or greater <br />s <br />a <br />'^ I 10` or less <br />1717 <br />IV <br />Ground Cover Requirements for <br />Slope Conditions <br />7 days <br />7 days <br />7 days <br />14 days <br />7 days <br />7 days <br />14 days <br />14 days <br />7 days <br />14 days <br />14 days <br />14 days <br />Steeper than 2 -1 Steeper than 3:1 3:1 -4:1 Flatter than 4:3 <br />T17 <br />SCALE:L 1" = 40' -0" <br />40 20 0 40 80 <br />device: \ \CRZSVR2 \Canon iR4570 PS3 file name: N:\1613 Sportsplex Field house \Civil \CAD Files Current \1613 Sportsplex Field Housel6yt Inam&fND031 T.dwg <br />222 cloister court <br />chapel hill, nc 27514 <br />919.401 .8586 <br />www.cra - ae.com <br />w <br />z <br />>= O <br />Z o <br />C) <br />Dew <br />V Lu Ln <br />u� <br />a D z <br />0= <br />Z <br />0 <br />�0 <br />� <br />OJ ° <br />aw J <br />Ocn� <br />no. revisions <br />NCDEQ RESPONSE <br />TO COMMENTS <br />8/30/17 <br />NCDEQ RESPONSE <br />TO COMMENTS <br />9/01/17 <br />ITNCDENR REVISION <br />#3 09/26/17 <br />4 TRC SUBMITTAL <br />11/20/17 <br />drawn checked <br />ETS MLH <br />EROSION <br />CONTROL PLAN <br />sheet <br />C5mO <br />date <br />10/23/2017 <br />date /time printed: 11/20/2017 12:48:13 PM <br />project no. <br />1613 <br />EROSION CONTROL PLAN LEGEND <br />EXISTING <br />PROPOSED, <br />- - <br />PROPERTY LINE <br />10' CONTOUR <br />610 <br />60•- <br />2' CONTOUR <br />608 <br />DROP INLET <br />STORM DRAINAGE LINE <br />TREE PR❑TECTI ❑N FENCE <br />TP TP <br />DITCH LINE <br />SILT FENCE <br />INLET PR❑TECTI ❑N <br />DIVERSI ❑N DITCH <br />C❑NSTRUCTI ❑N ENTRANCE <br />"7 <br />SILT FENCE OUTLET <br />SKIMMER HEAD <br />SEDIMENT BASIN <br />LIMITS OF DISTURBANCE <br />t� <br />TEMPORARY DIVERSI ❑N DITCH - <br />SCALE:L 1" = 40' -0" <br />40 20 0 40 80 <br />device: \ \CRZSVR2 \Canon iR4570 PS3 file name: N:\1613 Sportsplex Field house \Civil \CAD Files Current \1613 Sportsplex Field Housel6yt Inam&fND031 T.dwg <br />222 cloister court <br />chapel hill, nc 27514 <br />919.401 .8586 <br />www.cra - ae.com <br />w <br />z <br />>= O <br />Z o <br />C) <br />Dew <br />V Lu Ln <br />u� <br />a D z <br />0= <br />Z <br />0 <br />�0 <br />� <br />OJ ° <br />aw J <br />Ocn� <br />no. revisions <br />NCDEQ RESPONSE <br />TO COMMENTS <br />8/30/17 <br />NCDEQ RESPONSE <br />TO COMMENTS <br />9/01/17 <br />ITNCDENR REVISION <br />#3 09/26/17 <br />4 TRC SUBMITTAL <br />11/20/17 <br />drawn checked <br />ETS MLH <br />EROSION <br />CONTROL PLAN <br />sheet <br />C5mO <br />date <br />10/23/2017 <br />date /time printed: 11/20/2017 12:48:13 PM <br />project no. <br />1613 <br />