Orange County NC Website
DocuSign Envelope ID: 72E7BD50- E5C5- 4BEA- B4AA- FCA907469BF8 <br />MOVE FENCE OR <br />REMOVE TREE IF <br />MORE THAN 20% <br />OF A TREE'S MOVE FENCE OR <br />CRITICAL ROOT REMOVE TREE <br />ZONE IS <br />UNPROTECTED , <br />TREE <br />PROTECTION - <br />FENCE TIE ED A <br />CRiTIC'AL RV L�JP�`r, C <br />CONSTRUCTION AREA <br />RETAIN <br />1 <br />I 1 <br />A PRE - CONSTRUCTION CONFERENCE MUST <br />BE HELD WITH THE ENGINEER BEFORE ANY <br />SITE WORK BEGINS. A LANDSCAPE <br />PROTECTION SUPERVISOR WHO IS <br />REGISTERED MUST BE PRESENT ON SITE AT <br />ALL TIMES WHEN THE FOLLOWING ACTIVITIES <br />ARE TAKING PLACE: CLEARING, GRUBBING, <br />EXCAVATION, GRADING, TRENCHING, MOVING <br />OF SOIL, INSTALLATION AND REMOVAL OF <br />TREE PROTECTION FENCING, AND THE <br />DELIVERY, TRANSPORTING AND PLACEMENT <br />OF CONSTRUCTION MATERIALS AND <br />EQUIPMENT. <br />TREE PROTECTION NOTES: <br />1. ANY TREE ROOTS EXPOSED BY <br />CONSTRUCTION SHALL BE SEVERED CLEANLY <br />WITH A PRUNING TOOL. <br />2. DO NOT DISPOSE OF ANY CHEMICALS <br />OR REMOVE SOIL OUTSIDE THE AREA OF <br />WORK. <br />3. WHEN INSTALLING NEW LANDSCAPE <br />PLANTS, DO NOT DRIVE EQUIPMENT UPON <br />OR WITHIN THE CRITICAL ROOT ZONE OF <br />EXISTING TREES. <br />CONSTRUCTION SEQUENCE: <br />1. OBTAIN APPROPRIATE PERMITS. <br />2. HOLD PRE - CONSTRUCTION CONFERENCE <br />WITH LANDSCAPE PROTECTION <br />SUPERVISOR, ARCHITECT OR ENGINEER. <br />3. ERECT TREE PROTECTION FENCING. <br />4. CLEAR AND GRUB TREES AND SHRUBS <br />TO BE REMOVED. <br />5. INSTALL SOIL AND EROSION CONTROL <br />MEASURES. <br />6. ROUGH GRADE SITE. <br />7. EXCAVATE FOR FOOTINGS AND INSTALL <br />UTILITIES. <br />8. CONSTRUCT BUILDING. <br />R 00A <br />9. FINISH FINAL GRADING AND PAVING. <br />10. REMOVE TREE PROTECTION FENCING. <br />Elm LVA <br />TREE PROTECTION FENCING <br />SCALE: N.T.S. <br />11. INSTALL LANDSCAPING (TO BE SHOWN <br />ON LANDSCAPE PLAN). <br />7 CONCRETE FLUME SECTION <br />03.1 SCALE: N.T.S. 0000 /DIV- 02 /02520A13.DWG <br />0000 /DIV- 02/02800A01.DWG <br />w <br />V) <br />VARIES(SEE PROPOSED SPOT ELEVATIONS) <br />VARES(SEE PROPOSED <br />SPOT ELEVATIONS) <br />FINISHED GRATE, SEE a_ w STANDARD REINFORCED CONCRETE GRADE pPE GRADE <br />GRADE NOTES BELOW 7" FLANGE SEAT, o � w w FLARED END SECTION, SIZED SAME P SL <br />SEE NOTES BELOW N 1.5:1 SLOPE DIAMETER AS PIPE w <br />i <br />/r <br />3 3/4" 0 �p Z OR FLATTER, TYP. 0 o <br />11= III =11 III- III -II. Do !Z JUTE THATCHING <br />4 'FILTER GRASS LINED SWALE <br />FABRIC FILTER I <br />l l ° <br />6„ 2' -0" } SECTION A -A FABRIC SECTION B -B } <br />3" IN B B C3�1 SCALE: N.T.S. 0000 /DIV- 02/02270Al2.DWG <br />"WAFFLE" LO <br />�' °•'� 3 -0 PANELS Al2' MIN.) -Lo DRAIN BASINS TO BE MADE CAST IRON No I r I I (12' M�IN.� <br />V -11 1/2" 6„ `-` RESISTANT PVC CORROSION SLOTTED GRATE <br />b I o I i o 0 EARTH <br />3' -0" ° '� ° WITH WATERTIGHT ADAPTERS <br />J <br />MIN. GRADE I I o II o o AND FITTINGS. GRATES TO <br />SEE NOTE 2 ° �° ,° � ° BE MADE OF CAST IRON. TOP SOIL <br />3„ °° I GRASSED SLOPE SLOPE GRASSED <br />GRADE TO DR DRAIN GRADE <br />R.C.P. A <br />° GROUT PLAN PLAN 4! I , I \ <br />:.° ;. 6" WALL 1' -11 1 /2" MAXIMUM TAILWATER CONDITION MINIMUM TAILWATER CONDITON - - - <br />'' THICKNESS <br />r. (Tw >= O.5Do) (Tw < 0.5Do) - <br />3000 PSI TOP VIEW NOES: <br />CONCRETE ° a 6" 1. SEE PLANS FOR DIMENSIONS. - <br />a. ° NOTES: 2. La IS THE LENGTH OF THE RIP -RAP APRON. <br />1. IN AREAS OF PEDESTRIAN TRAFFIC, USE 3. W IS THE WIDTH OF THE DOWNSTREAM END OF THE RIP -RAP APRON. 8" DIA. CORRUGATED��Y'> <br />NEENAH FOUNDRY PEDESTIAN TYPE FRAME 4. DEPTH OF RIP -RAP SHALL BE 1.5 TIMES THE MAXIMUM STONE DIAMETER BUT NOT LESS ' <br />6" AND GRATE, No: R- 3210 -Q OR AN APPROVED THAN 6 INCHES. POLYETHYLENE PIPE <br />EQUAL FROM ENGINEER OF RECORD. 5. Do IS THE DIAMETER OF THE PIPE OUTLET. END CAP INSTALLED AFTER <br />4' -0" 6. IN WELL- DEFINED CHANNELS, EXTEND THE APRON UP THE CHANNEL BANKS TO AN HIGHEST INVERTS OF DROP <br />2. USE DEWEY BRCS. MANHOLE STEPS MH -ST -5 ELEVATION OF AT LEAST 6" HIGHER THAN THE MAXIMUM TAILWATER DEPTH OR TO THE <br />SIDE VIEW 3. 1ST STEP IS <br />SHOP'DRAWINGQP 7. AOFIL ER BLANKET OR FILER FABRIC SHALL BE INSTALLED BETWEEN THE RIP -RAP AND INLETS, OR AT END OF LINE. 8" DIA. CORRUGATED <br />TO THE ENGINEER FOR APPROVAL. SOIL FOUNDATION. POLYETHYLENE PIPE <br />NOTE: FROM PRECEEDING DI <br />2 CONCRETE DROP INLET - TOP VIEW AND SIDE VIEW 3 FLARED END SECTION 2. FOLLOW BASIN <br />ALL MANUFACTURERS OCURRENT INSTALLATION SPECIFICATIONS. <br />03.1 SCALE: N.T.S. 0000 /DIV- 02/02000A24.DWG C3�1 SCALE: N.T.S. 0000 /DIV- 02/02712A13.DWG 5 1211 DRAIN BASIN <br />C3.1 <br />OVERALL CLEAR DIMENSION OF <br />LANDING SHALL BE 50% 60 ", MIN. CONCRETE PRECAST CONCRETE <br />(SEE SITE PLAN FOR LANDING DIMENSIONS) EXTEND 12" MIN. GUTTER MAY BE USED <br />PARALLAL WITH BITUMINOUS (3000 PSI) INSTEAD OF BRICK <br />SURFACE FROM SURFACE <br />OVERALL RAMP WIDTH --I END OF RAMP <br />SHALL BE 5',MIN. I 5.0' O -C•- -I TREATMENT <br />MAX f 1 -1/2 <br />I 6" OVERLAP <br />EXTEND 12" MIN. -t o a. .v.........o.... a a ao MAXIMUM <br />PARALLAL WITH a � to .....a.� r... a PER BRICK <br />12' SURFACE FROM o ° N <br />END OF RAMP -------- ;....:; <...... �......... iv <br />--� 'll ... ° <br />MAXIMUM q•••• °• •••• <br />SLOPE =8.33% III` lu'I NC SH #7 a ... o........�. . , . <br />1 ro Z III[ = , III lL i.� C. A.B.C. o <br />u CONCRETE <br />t LANDING 18" x 18" MESH } <br />CONCRETE RAM 1 -1/2" I.D. PIPE SCREEN (THIS N <br />RAIL WITH POST AT END OF PIPE). 4" C. 1. SOIL <br />CONCRETE RAMP 3" DIA. CORE BORED <br />\i1 <br />HANDRAILS AND EDGE <br />LANDING TO <br />MATCH <br />HOLE FILLED WITH 5.0 O.C. MAX PAINTED. <br />SHALL BE PIPE BASE <br />ENGINEERED SOLUTIONS <br />Design in NC <br />II' 911 <br />Design Engineer: <br />LRS <br />Blue Cells = Input <br />PROTECTION NOT SHOWN. <br />� <br />EXIST SURFACE <br />Black Cells = Calculation <br />3000 P.S.I. NON- SHRINK COLOR BY ARCH. <br />COPPER DRAIN IN STONE <br />I I I <br />Project Name <br />Hillsborough Sportsplex REV1 <br />Project State <br />North Carolina <br />I 1I <br />Ik <br />I <br />MINIMUM CLEAR WIDTH FtP� <br />G <br />ELEVATIONS, <br />TYP. <br />GROUT, TYP. <br />FILLED DITCH <br />Impervious Area, Ai <br />SEE NOTE 3 <br />1/2 <br />Pervious Area, AID <br />0.04 <br />l- <br />BETWEEN EXTERIOR <br />93% <br />WZ) <br />Runoff Coefficient, Rv <br />0.89 <br />=0.05 +0.9 *(Ai /Ad) <br />2' -6" <br />SEE NOTE 2 <br />Y <br />o w <br />1.0 in <br />HANDRAILS, 4' -0" <br />g PIPE <br />RAIL FOR <br />RAMP <br />Storage Component Calculations <br />STRUCTURE (LIFTING CLUTCHES PROVIDED), <br />GROUT INVERT <br />Capture 75% of WQV <br />1453.8 ft' <br />Z <br />Pretreatment credit (estimated or calculated), %pre <br />/ <br />THICKNESS <br />Mass loading calculations <br />° a <br />TOP VIEW <br />Mean Annual Rainfall, P <br />46 in <br />NOTES: <br />Agency required % removal <br />85% <br />1. IN AREAS OF PEDESTRIAN TRAFFIC, USE <br />Percent Runoff Capture (% capture) <br />C3.1 SCALE: N.T.S. <br />0000 /DIV- 02/02895A1 9.DWG <br />Mean Annual Runoff,Vt <br />80,251 ft' <br />= P *Ad *Rv *(43560 /12) *%capture <br />Event Mean Concentration of Pollutant, EMC <br />70.0 mg /I <br />(Suggestion: Use 60 for residential, 70 far Commercial. 100 for Induslna <br />NOTE: <br />1. ALL ACCESSIBLE RAMPS SHALL COMPLY WITH LATEST VERSION OF <br />e EMC *Vt *(28.3) *(0.000001) *(2.2046) <br />Filter System <br />PROJFCTNn <br />15" ON CENTER. 1ST STEP IS 2' FROM TOP. <br />Filtration brand <br />StormFilter <br />3. CONTRACTOR SHALL SUBMIT SHOP DRAWING <br />Cartridge height <br />27 in <br />TO THE ENGINEER FOR APPROVAL. <br />N.C. STATE BUILDING ACCESSIBILITY CODE, VOLUME 1 -C. <br />SUMP - TOP VIEW AND SIDE VIEW <br />Mass removed by pretreatment system, Mpre <br />CONCRETE <br />_\ <br />= Mtotal * %removal <br />Mass load to filters after pretreatment, Mpassl <br />245 Ibs <br />= Mtotal - Mpre <br />Estimate the required filter efficiency, Etlter <br />79 °Io <br />2. RAILS ON RAMPS WITH INDIVIDUAL LANDING SHALL BE CONTINUOUS <br />Mass to be captured by filters, Mf,d1er <br />193 Ibs <br />=Mpassl ' Efilter <br />3000 PSI <br />7.5 gpm <br />=q * (7.5 ft2 1cartridge) <br />Mass load per cartridge, Mart (Ibs) <br />54 Ibs <br />= lookup mass load per cartridge <br />Number of Cartridges required, Nrroass <br />TO BUILDING EXTERIOR WALLS. <br />= ROUNDLIP(Mfilter /Mcart,O) <br />Maximum Treatment Capacity <br />0.07 <br />= Nmass *(Qcart/449) <br />°. <br />.° a °. ° a <br />} <br />g <br />ACCESSIBLE RAMP DETAIL <br />00 <br />AQ d° <br />} <br />,3.1 <br />SCALE: N.T.S. 0000 /DIV- 02/02895A18.DWG <br />8' <br />_8" <br />NOTES: <br />3' -10" <br />1. NO STORM DRAIN UNDER 3. DEWEY BROS. MH -ST -5 <br />CITY MAINTAINED STREETS LESS (MANHOLE STEPS OR APPROVED <br />THAN 15" R.C.P. EQUAL). 1ST STEP IS 2' FROM <br />2. NO CORRUGATED METAL TOP. <br />PIPE WITHOUT PERMISSION FROM 4. IF PRE -CAST STRUCTURE <br />TOWN ENGINEER. TO BE USED, SHOP DRAWINGS <br />MUST BE SUBMITTED TO THE <br />ENGINEER FOR APPROVAL. <br />10 CURB INLET - SIDE VIEW <br />\i1 <br />Determining Number <br />of <br />C54UlFNTECH` <br />Cartrid es for <br />Volume -Based <br />ENGINEERED SOLUTIONS <br />Design in NC <br />II' 911 <br />Design Engineer: <br />LRS <br />Blue Cells = Input <br />Date <br />111612018 <br />Black Cells = Calculation <br />Site Information <br />08" STUB <br />I I I <br />Project Name <br />Hillsborough Sportsplex REV1 <br />Project State <br />North Carolina <br />I 1I <br />Ik <br />I <br />Project Location <br />Hillsborough Sportsplex <br />Drainage Area, Ad <br />0.60 ac <br />1 II <br />} r JL- <br />=c- <br />Impervious Area, Ai <br />0.56 ac <br />1/2 <br />Pervious Area, AID <br />0.04 <br />l- <br />% Impervious <br />93% <br />WZ) <br />Runoff Coefficient, Rv <br />0.89 <br />=0.05 +0.9 *(Ai /Ad) <br />Water Quality Volume Calculations <br />SEE NOTE 2 <br />Y <br />Design storm rainfall depth, Rd <br />1.0 in <br />- -- I\ <br />Water quality volume, WQV <br />1938.4 ft3 <br />=Ad *Rv *Rd *(43560/12) <br />Storage Component Calculations <br />STRUCTURE (LIFTING CLUTCHES PROVIDED), <br />► W 9 <br />Capture 75% of WQV <br />1453.8 ft' <br />= 0.75 *WQV <br />Pretreatment credit (estimated or calculated), %pre <br />30% <br />THICKNESS <br />Mass loading calculations <br />° a <br />TOP VIEW <br />Mean Annual Rainfall, P <br />46 in <br />NOTES: <br />Agency required % removal <br />85% <br />1. IN AREAS OF PEDESTRIAN TRAFFIC, USE <br />Percent Runoff Capture (% capture) <br />90% <br />NEENAH FOUNDRY PEDESTIAN TYPE FRAME <br />Mean Annual Runoff,Vt <br />80,251 ft' <br />= P *Ad *Rv *(43560 /12) *%capture <br />Event Mean Concentration of Pollutant, EMC <br />70.0 mg /I <br />(Suggestion: Use 60 for residential, 70 far Commercial. 100 for Induslna <br />Annual Mass Load, Mt °tai <br />350.48 Ibs <br />e EMC *Vt *(28.3) *(0.000001) *(2.2046) <br />Filter System <br />PROJFCTNn <br />15" ON CENTER. 1ST STEP IS 2' FROM TOP. <br />Filtration brand <br />StormFilter <br />3. CONTRACTOR SHALL SUBMIT SHOP DRAWING <br />Cartridge height <br />27 in <br />TO THE ENGINEER FOR APPROVAL. <br />Cartridge Quantity Calculation <br />SUMP - TOP VIEW AND SIDE VIEW <br />Mass removed by pretreatment system, Mpre <br />105 Ibs <br />= Mtotal * %removal <br />Mass load to filters after pretreatment, Mpassl <br />245 Ibs <br />= Mtotal - Mpre <br />Estimate the required filter efficiency, Etlter <br />79 °Io <br />= 1 +( °forelnoval - 1)I(1 - °/ °pre) <br />Mass to be captured by filters, Mf,d1er <br />193 Ibs <br />=Mpassl ' Efilter <br />Maximum Cartridge Flow rate, Qcart <br />7.5 gpm <br />=q * (7.5 ft2 1cartridge) <br />Mass load per cartridge, Mart (Ibs) <br />54 Ibs <br />= lookup mass load per cartridge <br />Number of Cartridges required, Nrroass <br />4 <br />= ROUNDLIP(Mfilter /Mcart,O) <br />Maximum Treatment Capacity <br />0.07 <br />= Nmass *(Qcart/449) <br />SUMMARY <br />Maximum Treatment Flow Rate, cfs 0.07 <br />Cartridge Flow Rate, gpm 7.5 <br />Number of Cartridges 4 <br />@2008 CONTECH Stormwater Solutions <br />co ntech storm wate r. com <br />13 STORM FILTER <br />:� SCALE;�N.T„$. <br />•® <br />Z. <br />36"x 36" <br />HATCH <br />CAST -IN (FLUSH MOUNT) -- <br />> >>>\ > > > > <br />> > % > > > > > > >> > > > > > > > > <br />> > > > > � > > > > >> >>> <br />�t I <br />_ <br />INLET 1 �. f�� 05' I.D. <br />0610.0. <br />PLAN VIEW <br />CARTRIDGES AND FLOW KIT NOT SHOWN <br />CONTECH TO CAST -IN <br />FRAME AND COVER <br />OUTLET 1 <br />RIM ELEV. 617.75' <br />TOP OF SYSTEM <br />ELEV. 617.72' <br />w <br />INLET 1 INVERT <br />ELEV. 613.70' <br />OUTLET 1 INVERT <br />ELEV. 613.20' <br />FLOW KIT ,, OUTSIDE BOTTOM <br />ELEV. 612.38' <br />06-0" SEE OUTLET DETAIL <br />ELEVATION VIEW (THIS SHEET) <br />SEALED OUTLET <br />RISER <br />SCALE: N.T.S. <br />SECTION A -A <br />SITE DESIGN DATA <br />WATER QUALITY <br />VOLUME <br />rT - - - ------ - - - - -- 71 <br />OUT LET <br />I - I <br />I <br />r �__,w nil <br />N/A CFS <br />RETURN PERIOD OF <br />I I ��� <br />II' 911 <br />c g <br />FILTER MEDIA TYPE <br />A <br />V I II <br />II� dl1 <br />STUB A <br />FLOW <br />08" STUB <br />I I I <br />III I <br />, <br />INLET 1 PIPE <br />012" CMP <br />__ <br />` <br />I 1I <br />Ik <br />I <br />I 111 <br />111 <br />I I "WAFFLE„ <br />(016" OPENING) <br />° <br />1 II <br />} r JL- <br />=c- <br />1 -11 <br />1/2 <br />io <br />-- <br />l- <br />" <br />3'- 0 <br />RIM ELEV. 617.75' <br />TOP OF SYSTEM <br />ELEV. 617.72' <br />w <br />INLET 1 INVERT <br />ELEV. 613.70' <br />OUTLET 1 INVERT <br />ELEV. 613.20' <br />FLOW KIT ,, OUTSIDE BOTTOM <br />ELEV. 612.38' <br />06-0" SEE OUTLET DETAIL <br />ELEVATION VIEW (THIS SHEET) <br />SEALED OUTLET <br />RISER <br />SCALE: N.T.S. <br />SECTION A -A <br />SITE DESIGN DATA <br />WATER QUALITY <br />VOLUME <br />FLOW RATE <br />GRATE, SEE <br />PEAK FLOW RATE <br />N/A CFS <br />RETURN PERIOD OF <br />NIA YRS <br />PEAK FLOW <br />c g <br />FILTER MEDIA TYPE <br />PHOSPHOSORB <br />0000/ D I V -02/02 000A02. D W G <br />SCALE: N.T.S. <br />0000/ D I V -02/02 725A04. D W G <br />I 8 I <br />IIIIIIIIIIIIII <br />CAST IRON GRATES <br />8.5" 4„ AVAILABLE: PERFORATED, <br />SOLID, LOCKING, DOMED. <br />+ y 4 "TO 6" <br />8" AND 10" DRAINS <br />INLINE INLINE <br />DRAIN, -' DRAIN <br />INLINE y ,.. <br />It, DRAIN` <br />nun utn, <br />DRAIN <br />BASIN <br />TYPICAL INSTALLATIONS <br />NOTE: <br />1. ALL BASIN GRATES TO BE SLOTTED CAST IRON. <br />2. FOLLOW ALL MANUFACTURERS CURRENT INSTALLATION SPECIFICATIONS. <br />HIGH DENSITY POLYETHYLENE NOTE: SEE SITE PLAN FOR LENGTH, <br />INLINE DRAIN AND INSTALLATION <br />03.1 SCALE: N.T.S. <br />0000 /DIV- 02 /02725A06.DWG <br />FINISHED <br />GRATE, SEE <br />OUTLET RISER <br />GRADE <br />NOTES BELOW <br />FLANGE SEAT <br />- SAND COLLAR OR BOOT <br />c g <br />SEE NOTES BELOW <br />= III =III 11= III ='' <br />. I I- III -I I <br />'' -III III = III =III= <br />- III - III -I I <br />3 3/4" <br />CONTECH <br />11 L'6 <br />08" STUB <br />CONTECH <br />=a� <br />llg, <br />$ <br />, <br />' <br />2-Off -� <br />I <br />- <br />3" IN <br />�- <br />3, -0„ _4: <br />I I "WAFFLE„ <br />4 <br />° <br />I I PANELS <br />1 -11 <br />1/2 <br />_ <br />-- <br />I 6„ <br />" <br />3'- 0 <br />WZ) <br />R.C.P. <br />MIN. GRADE <br />0 r- <br />"s_ <br />*' <br />SEE NOTE 2 <br />Y <br />n <br />3„ <br />- -- I\ <br />1.2 <br />B. CONTRACTOR TO PROVIDE EQUIPMENT WITH SUFFICIENT LIFTING AND REACH CAPACITY TO LIFT AND SET THE STORMFILTER <br />12" SEDIMENT <br />STRUCTURE (LIFTING CLUTCHES PROVIDED), <br />► W 9 <br />STORAGE SUM <br />- <br />GROUT e <br />-" - <br />6" WALL 1' -11 1/2" -- <br />° <br />D. CONTRACTOR TO PROVIDE, INSTALL, AND GROUT INLET PIPE(S). ALL PIPE CENTERLINES TO MATCH PIPE OPENING CENTERLINES. <br />THICKNESS <br />° <br />° a <br />TOP VIEW <br />3000 PSI <br />4.. ° 6" <br />° <br />NOTES: <br />CONCRETE <br />' <br />1. IN AREAS OF PEDESTRIAN TRAFFIC, USE <br />318" = 1' -0" <br />F. CONTRACTOR TO TAKE APPROPRIATE MEASURES TO PROTECT CARTRIDGES FROM CONSTRUCTION - RELATED EROSION RUNOFF. <br />NEENAH FOUNDRY PEDESTIAN TYPE FRAME <br />-r 6" <br />►-- <br />AND GRATE, No: R- 3210 -Q OR AN APPROVED <br />KMR <br />4' -0" <br />EQUAL FROM ENGINEER OF RECORD. <br />APPROVED: <br />STRUCTURE WEIGHT <br />CONTECH <br />2. USE DEWEY BROS. MANHOLE STEPS MH -ST -5 <br />PROJFCTNn <br />15" ON CENTER. 1ST STEP IS 2' FROM TOP. <br />APPROXIMATE HEAVIEST PICK = 507 LRS, OF 2 PIECES KN86293 <br />SIDE VIEW <br />3. CONTRACTOR SHALL SUBMIT SHOP DRAWING <br />BASE SECTION SHIPPED WITH CARTRIDGES INSTALLED PROPOSAL LAYOUT 1A <br />TO THE ENGINEER FOR APPROVAL. <br />%14� CONCRETE DROP INLET WITH SEDIMENT <br />SUMP - TOP VIEW AND SIDE VIEW <br />C3.1/ SCALETS. <br />625.00' CENTER OF FIELD <br />2,5' FIELD <br />TURF <br />0.5% 0.5% <br />SLOPE SLOPE <br />1x12 FLAT DRA <br />@ 30' 0. C. <br />NDISTURBED GE ❑TEXTILE <br />SUBGRADE FABRIC- MIRAFI <br />2" #89 <br />CAP STONE <br />PROPOSED 6"x12" <br />�IIICONCRETE CURB <br />IN 182A MWON, <br />4" #57 FREE <br />DRAINING BASE <br />AGGREGATE <br />11 \ATHLETIC FIELD SUB DRAINAGE SYSTEM WITH CURB DETAIL <br />SCALE: N.T.S. <br />DESCRIPTION <br />INSTALLED BY <br />4 <br />OUTLET RISER <br />g <br />$ € <br />VOLUME GPM RESTRICTOR DISK (PRP) <br />- SAND COLLAR OR BOOT <br />c g <br />s <br />�N <br />g <br />012 " STUB <br />a <br />�W <br />CONTECH <br />11 L'6 <br />08" STUB <br />CONTECH <br />=a� <br />llg, <br />$ <br />SEALANT FOR JOINTS (BY PRECASTER) <br />CONTRACTOR <br />,_`1;� <br />�- <br />CONTECH <br />4. STRUCTURE SHALL MEET AASHTO HS -20 LOAD RATING, ASSUMING EARTH COVER OF 0'- 5', AND GROUNDWATER ELEVATION AT, OIR <br />- 5 <br />4 <br />SHALL MEET AASHTO M306 LOAD RATING AND BE CAST WITH THE CONTECH LOGO. <br />C -M / <br />(ILLUSTRATION ONLY) <br />MATERIAL LIST (PROVIDED BY CONTECH) <br />MOLDED -IN CUT LINE <br />(SEE INSTALLATION NOTE E) <br />ROUT (BY CONTECH) <br />COUNT <br />DESCRIPTION <br />INSTALLED BY <br />4 <br />27" PHOSPHOSORB CARTRIDGE <br />CONTECH <br />4 <br />VOLUME GPM RESTRICTOR DISK (PRP) <br />CONTECH <br />1 <br />41A FLOWKIT <br />CONTECH <br />1 <br />SEALED OUTLET RISER <br />CONTECH <br />3 <br />STEPS. P10CTS, LANE LADDER, OR EQUIV. <br />CONTECH <br />1 <br />SEALANT FOR JOINTS (BY PRECASTER) <br />CONTRACTOR <br />1 <br />36" x 36" STANDARD HATCH, EJ #00819761 B01, OR EQUIV. <br />CONTECH <br />z <br />0 <br />LU V <br />C <br />W <br />a <br />0 <br />U0 <br />S <br />Q W <br />z � <br />0 <br />0 <br />Q <br />W <br />Z - <br />Y <br />o <br />x <br />PERFORMANCE SPECIFICATION <br />,Zt <br />Lf) <br />LLI <br />J <br />LU Q <br />N <br />� <br />d <br />� <br />U <br />J J <br />D_ <br />z <br />GENERAL NOTES <br />co <br />1. CONTECH To PROVIDE ALL MATERIALS UNLESS NOTED OTHERWISE. <br />I: <br />2. FOR FABRICATION DRAWINGS WITH DETAILED STRUCTURE DIMENSIONS AND WEIGHT, PLEASE CONTACT YOUR CONTECH ENGINEERED <br />ry <br />LLLL <br />Q <br />ry <br />xNOT IN CONTRACT, FOR <br />COORDINATION ONLY <br />EXISTING <br />TRASH RACK <br />TO REMAIN <br />\54' CORRUGATED <br />PLAN VIEW METAL STANDPIPE <br />54' CORRUGATED <br />4L PIPE W/ COLLAR <br />/ERLAP <br />ING 54' <br />1GATED <br />STANDPIPE <br />lJ I PR ❑FILE VIEW <br />7 <br />('1_2"' <br />CMP STANDPIPE WITH TRASH RACK DETAIL <br />7 C3.1 SCALE: N.T.S. <br />222 cloister court <br />chapel hill, nc 27514 <br />919.401 .8586 <br />www.cro- ae.com <br />z <br />� O <br />Z o <br />0 � w <br />V uu cn <br />W a � <br />0 t <br />z <br />z <br />ad o <br />D <br />1<OJ ° <br />aw J <br />Ocn� <br />no. revisions <br />'� <br />ADDENDUM #2 <br />PERFORMANCE SPECIFICATION <br />120 <br />FILTER CARTRIDGES SHALL BE MEDIA- FILLED, PASSIVE, SIPHON ACTUATED. RADIAL FLOW, AND SELF CLEANING. RADIAL MEDIA DEPTH <br />LU Q <br />SHALL BE 7- INCHES. FILTER MEDIA CONTACT TIME SHALL BE AT LEAST 38 SECONDS. <br />0 J <br />SPECIFIC FLOW RATE SHALL BE 1 GPM/SF (MAXIMUM). SPECIFIC FLOW RATE IS THE MEASURE OF THE FLOW (GPM) DIVIDED BY THE MEDIA <br />J J <br />SURFACE CONTACT AREA (SF). MEDIA VOLUMETRIC FLOW RATE SHALL BE 6 GPMICF OF MEDIA (MAXIMUM). <br />_ <br />GENERAL NOTES <br />_J � <br />1. CONTECH To PROVIDE ALL MATERIALS UNLESS NOTED OTHERWISE. <br />COMMENT 01/02/18 <br />2. FOR FABRICATION DRAWINGS WITH DETAILED STRUCTURE DIMENSIONS AND WEIGHT, PLEASE CONTACT YOUR CONTECH ENGINEERED <br />0 cl� <br />SOLUTIONS LLC REPRESENTATIVE. www.ContechES.com <br />Q <br />3. STORMFILTER WATER QUALITY STRUCTURE SHALL BE IN ACCORDANCE WITH ALL DESIGN DATA AND INFORMATION CONTAINED IN THIS <br />CO <br />DRAWING. CONTRACTOR TO CONFIRM STRUCTURE MEETS REQUIREMENTS OF PROJECT. <br />4. STRUCTURE SHALL MEET AASHTO HS -20 LOAD RATING, ASSUMING EARTH COVER OF 0'- 5', AND GROUNDWATER ELEVATION AT, OIR <br />BELOW, THE OUTLET PIPE INVERT ELEVATION. ENGINEER OF RECORD TO CONFIRM ACTUAL GROUNDWATER ELEVATION. CASTINGS <br />SHALL MEET AASHTO M306 LOAD RATING AND BE CAST WITH THE CONTECH LOGO. <br />�n <br />_ <br />5. STORMFILTER STRUCTURE SHALL BE PRECAST CONCRETE CONFORMING TO ASTM C -478 AND AASHTO LOAD FACTOR DESIGN METHOD. <br />Q e �C <br />WZ) <br />v <br />INSTALLATION NOTES <br />0 r- <br />"s_ <br />*' <br />A. ANY SUB -BASE, BACKFILL DEPTH, ANDIOR ANTI - FLOTATION PROVISIONS ARE SITE - SPECIFIC DESIGN CONSIDERATIONS AND SHALL BE <br />Y <br />n <br />SPECIFIED BY ENGINEER OF RECORD. <br />0 c <br />w v� <br />1.2 <br />B. CONTRACTOR TO PROVIDE EQUIPMENT WITH SUFFICIENT LIFTING AND REACH CAPACITY TO LIFT AND SET THE STORMFILTER <br />STRUCTURE (LIFTING CLUTCHES PROVIDED), <br />► W 9 <br />ry V) <br />C. CONTRACTOR TO INSTALL JOINT SEALANT BETWEEN ALL STRUCTURE SECTIONS AND ASSEMBLE STRUCTURE. <br />j Z ` <br />° <br />D. CONTRACTOR TO PROVIDE, INSTALL, AND GROUT INLET PIPE(S). ALL PIPE CENTERLINES TO MATCH PIPE OPENING CENTERLINES. <br />w <br />E. CONTRACTOR TO PROVIDE AND INSTALL CONNECTOR TO THE OUTLET RISER STUB. STORMFILTER EQUIPPED WITH A DUAL DIAMETER <br />HDPE OUTLET STUB. IF OUTLET PIPE IS LARGER THAN 8 INCHES, CONTRACTOR TO REMOVE THE 8 INCH OUTLET STUB AT MOLDED IN <br />DATE: <br />SCALE. <br />CUT LINE. COUPLING BY FERNCO OR EOUAL AND PROVIDED BY CONTRACTOR. <br />01117/18 <br />318" = 1' -0" <br />F. CONTRACTOR TO TAKE APPROPRIATE MEASURES TO PROTECT CARTRIDGES FROM CONSTRUCTION - RELATED EROSION RUNOFF. <br />DESIGNED: <br />DRAWN: <br />G. CONTRACTOR TO INSTALL SUPPLIED PLUG IN CONSTRUCTION FLOW BYPASS WHEN SYSTEM IS BROUGHT ON LINE (PRESSURE FIT ONLY <br />KMR <br />KMR <br />DO NOT GLUE)' <br />CHECKED <br />APPROVED: <br />STRUCTURE WEIGHT <br />CONTECH <br />PROJFCTNn <br />$EQUENCE NP.: <br />APPROXIMATE HEAVIEST PICK = 507 LRS, OF 2 PIECES KN86293 <br />878254 <br />10 <br />BASE SECTION SHIPPED WITH CARTRIDGES INSTALLED PROPOSAL LAYOUT 1A <br />_Lr <br />1 OF 1 <br />MAX FOOTPRINT m 06' DRAWING 5814 1 KNSC <br />xNOT IN CONTRACT, FOR <br />COORDINATION ONLY <br />EXISTING <br />TRASH RACK <br />TO REMAIN <br />\54' CORRUGATED <br />PLAN VIEW METAL STANDPIPE <br />54' CORRUGATED <br />4L PIPE W/ COLLAR <br />/ERLAP <br />ING 54' <br />1GATED <br />STANDPIPE <br />lJ I PR ❑FILE VIEW <br />7 <br />('1_2"' <br />CMP STANDPIPE WITH TRASH RACK DETAIL <br />7 C3.1 SCALE: N.T.S. <br />222 cloister court <br />chapel hill, nc 27514 <br />919.401 .8586 <br />www.cro- ae.com <br />z <br />� O <br />Z o <br />0 � w <br />V uu cn <br />W a � <br />0 t <br />z <br />z <br />ad o <br />D <br />1<OJ ° <br />aw J <br />Ocn� <br />no. revisions <br />'� <br />ADDENDUM #2 <br />07/26/17 <br />17 <br />NCDENR REVISI ❑N <br />#3 09/26/17 <br />7 <br />TRC SUBMITTAL <br />12/18/17 <br />STEIRMWATER <br />COMMENT 01/02/18 <br />drawn checked <br />ETS MLH <br />GRADING AND <br />STORM DRAINAGE <br />DETAILS <br />sheet <br />C3ml <br />date project no. <br />12/15/2017 1613 <br />