Orange County NC Website
DocuSign Envelope ID: 72E7BD50- E5C5- 4BEA- B4AA- FCA907469BF8 <br />[Departmental Use Only] <br />TITLE Sportsplex Sidewalk <br />FY 2017 -18 <br />NORTH CAROLINA <br />CONSTRUCTION AGREEMENT UNDER $250,000.00 <br />ORANGE COUNTY <br />THIS CONSTRUCTION AGREEMENT (hereinafter called "Agreement "), made as of the 25th <br />day of April, 2018, by and between Triangle Landscaping Inc, (hereinafter called the "Contractor "), and <br />Orange County, a body politic and a political subdivision of the State of North Carolina, (hereinafter <br />called the "Owner "). <br />WITNESSETH: <br />That the Contractor and the Owner, for the consideration herein named, agree as follows: <br />1. CONTRACT DOCUMENTS; PRIORITY <br />The Contract Documents consist of this Agreement, the Request for Proposals, Proposal, <br />Construction Drawings, and Written Specifications. The Contract Documents form the Contract. In the <br />event of any inconsistency between or among the Contract Documents the Contract Documents shall be <br />interpreted in the following order of priority: <br />a. This Agreement. <br />b. Designer Approved Bulletins and/or Field Orders. <br />c. Request for Proposals and addenda thereto. <br />d. Proposal. <br />2. SCOPE OF WORK <br />The Contractor shall furnish and deliver all of the materials, and perform all of the work <br />required by this Agreement within the time period stipulated in a written Notice -to- Proceed to be <br />executed by the Contractor and Owner and in accordance with the following enumerated documents, <br />which are made a part hereof as if fully contained herein: <br />a. Construction Drawings prepared by CRA (Sheet C0.1, C1.0, C1.1, C1.2, C2.1, C2.2, C3.0, <br />C3.1, C3.2, C3.3, C4.0, C4.1, C5.0, C5.1, C5.2, L1.0, L1.1, CL1.0 as pertaining to the <br />sidewalk located along Hwy 70 dated 12/15/17, 9/1/17, 9/26/17, 10/23/17, 12/18/17) <br />b. Written specifications prepared by the project engineer. <br />c. Triangle Landscaping Inc proposal dated April 2, 2018, per scope of work indicated on the <br />listed drawings which fully describes the work to be performed. Such work will hereafter <br />be called the "Work ". <br />d. Related documents listed under Section 1 above. <br />Revised 10/17 1 <br />