Orange County NC Website
DocuSign Envelope ID: C28BF39E- EOF1- 42FB- 9F5B- 93F375B7013B <br />Proposal for Construction and Materials Testing Services Irerracon <br />Sportsplex Field House ■ 101 Meadowlands Drive Hillsborough, NC 27278 <br />February 20th, 2018 ■ Terracon Proposal No. 70171288 <br />0 Formal laboratory testing reports will be submitted within 2 business days of the completion <br />of the testing. <br />In addition, a short video about CMELMS'^' and the value that it brings to the project can be viewed <br />at http : / /www.terracon.comiservices /construction - materials/. <br />E. SAFETY <br />At Terracon, we all have a personal and uncompromising <br />commitment to everyone going home safely each and every day. <br />&TP Incident Incident and Injury-Free 11 is about care and concern for people. <br />Incident and Injury -Free' t � p p <br />It is our commitment at all levels of the company where safety is <br />held as a core value and an operational priority. Working safely is an inseparable part of working <br />correctly, and just as important as other operational priorities, including quality, profitability and <br />schedule. 11F is our commitment to people, valued by us for who they are and what they do. 11F is <br />not just something we do; it's in everything we do. <br />As part of being truly 11F, we will prepare a "Pre -Task Plan" for this project where we will identify <br />the potential site safety and job hazards associated with your site. Our Pre -Task Plan will identify <br />and prepare our personnel to handle conditions such as traffic control, environmental <br />contamination, site access issues, overhead and underground utilities, adverse weather <br />conditions, and personal protection equipment. <br />F. COMPENSATION <br />Our services will be provided on a unit rate basis in accordance with the attached unit rate <br />fee schedule. At the time of this proposal we have not been provided with a construction <br />schedule. We have based our estimated fee on experience with similar projects of scope, <br />size, and construction. Our estimate is broke down in detail on the attached budget <br />worksheet. Terracon recommends and a time and materials budget of $28,768.88 be <br />established for this project. <br />We have not included attending progress meetings in our cost estimate. Progress meetings <br />will be attended at the request of the Rhetson Companies representative, and invoiced in <br />accordance with the attached fee schedule in addition to estimate fee. <br />Should additional services or site visits be required that are outside the scope of work and <br />estimated site visits outlined above they will be performed at the unit rates shown on the <br />Fee 'Schedule. <br />The above cost would not be exceeded without prior written approval from the client. If <br />services are requested beyond the above scope of services or if additional site visits are <br />Responsive -9 resourceful a Reliable 6 <br />