Browse
Search
2018-154-E AMS - Terracon Sportsplex Fieldhouse testing
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-154-E AMS - Terracon Sportsplex Fieldhouse testing
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2018 5:10:32 PM
Creation date
5/14/2018 9:41:11 AM
Metadata
Fields
Template:
Contract
Date
3/16/2018
Contract Starting Date
3/16/2018
Contract Ending Date
7/1/2018
Contract Document Type
Agreement - Services
Amount
$28,768.88
Document Relationships
R 2018-154 AMS - Terracon Sportsplex FH testing
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: C28BF39E- EOF1- 42FB- 9F5B- 93F375B7013B <br />Proposal for Construction and !Materials Testing Services Irerracon <br />Sportsplex Field House m 101 Meadowlands Drive Hillsborough, NC 27278 <br />February 20th, 2018 m Terracon Proposal No. 70171288 <br />Terracon will only provide testing when contacted by your designated representative and will not <br />be responsible for required testing if we are not scheduled, <br />D. DATA MANAGEMENT AND REPORTING <br />To enhance the service Terracon provides to our clients„ we use a proprietary <br />project management and data management software program known as <br />Cmlwe. IBS CMELMS11 (Construction Materials Engineering Laboratory Management <br />System). CMELMS'm is a program developed by Terracon specifically tailored for <br />Construction Quality Control and Quality Assurance consulting and testing projects. CMELMS11 <br />allows us to electronically track all client service requests, daily field reports, laboratory test <br />results, concrete history and performance, invoicing, project budgets, and project report and <br />invoice distribution. The software creates a database for each project that allows us to provide <br />timely and constant communication to our clients and instantaneous retrieval of field and <br />laboratory reports and test results and budget information. This proves to be invaluable to our <br />project managers and our clients when discussing specific project details and data. Furthermore, <br />we can also provide distribution of reports and invoicing to our clients via electronic methods. <br />This includes email distribution or setting up project specific "Client Document Website" where <br />our clients and other approved Project Team members can go to via the Internet and retrieve <br />critical project information. <br />Through our CMELMS" program, we have the capability to efficiently track and develop a listing <br />of our tests and observations that are not in compliance with the approved plans and <br />specifications for the project. This deviation log is maintained throughout the project and serves <br />as one point of reference that can be viewed by the project team members to see which items are <br />still unresolved. Maintenance and distribution of a deviation log serves to help address and <br />correct deviations throughout the project. <br />Each of our technicians is provided a field laptop and smartphone. With these devices, the <br />technicians have the ability to connect to the internet, complete their report in the field <br />electronically and submit it directly to the project manager in the office through CMELMS'"'. Once <br />the report is submitted, it is instantly uploaded to the project manager's dashboard for review. If <br />a deviation is noted within the report, an email notification is automatically sent to the project <br />manager informing him or her of the non - conforming items and that action may be required, At <br />Terracon, we have a company -wide standard utilizing the following reporting goals: <br />• Formal reports containing deviations or non. conforming items will be submitted within 24 <br />hours of the site visit. <br />• Formal reports without deviations or non - conforming items will be submitted within 5 business <br />days of the site visit.. <br />Responsive i Resourceful u Reliable 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.