Browse
Search
Agenda - 05-15-2018 8-a - Minutes
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2018
>
Agenda - 05-15-2018 Regular Meeting
>
Agenda - 05-15-2018 8-a - Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2018 5:08:22 PM
Creation date
5/10/2018 5:22:44 PM
Metadata
Fields
Template:
BOCC
Date
5/15/2018
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8-a
Document Relationships
Agenda - 05-15-2018 Regular Board Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2018\Agenda - 05-15-2018 Regular Meeting
Minutes 05-15-2018
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 <br /> <br />Todd Wirt said yes, and the topic would be sent back to the OCS BOE for discussion. 1 <br />Commissioner Rich asked if the current living wage could be identified. 2 <br />Bonnie Hammersley said the Orange County living wage is currently $13.75, and will 3 <br />increase to $14.25 on July 1, 2019. She said the County has a living wage for permanent 4 <br />employees of $15. 5 <br />Pam Jones said she will be sharing information regarding the OCS Capital Investment 6 <br />Plan (CIP). She said the plan is one of stewardship, and aging buildings need to be 7 <br />maintained. She said in 2013 OCS completed a facilities assessment, and has prioritized those 8 <br />since then, and the bond issue projects were built on this study. She said OCS also completed 9 <br />a safety and security assessment, which it continues to deploy. She said $2.5 million was 10 <br />included in the bonds that have been earmarked for safety and security. She said the third 11 <br />area of study, completed in 2016, is the roof study, and this is also lot of what is seen in the 12 <br />bond projects and CIP. She said if the exteriors of buildings are not secure, the interiors will 13 <br />fail, and roofs, windows and walls are being maintained. 14 <br />Pam Jones said there are a few material changes in the CIP since last year: 15 <br />1.) Cameron Park Elementary has air quality issues and water filtration problems, and 16 <br />exterior of the building needs resurfacing and windows replacing; 17 <br />2.) $100k is needed for New Hope Elementary HVAC, some air handlers are failing 18 <br />early. 19 <br />Pam Jones said the CIP is essentially the same as last year, and just deals with the 20 <br />basics. She said she would like to update the BOCC on two primary bond projects included in 21 <br />the CIP: 22 <br />1.) The Orange High School geothermal project, which has bids in, and will be taken to 23 <br />the OCS BOE’s next meeting. She said it came in over estimates, but not as much 24 <br />as feared, and this will be completed in phases over two years, with renovations 25 <br />being completed along the way. She said floors and wings will be opened up one at 26 <br />a time, until the work is complete. She said modular units are being considered, 27 <br />since there is not enough capacity, and OCS hopes for creativity from contractors to 28 <br />get the project done as quickly as possible. She said OCS is working on a public 29 <br />relations campaign to communicate with the neighbors regarding noise and run off. 30 <br />She said the payback on this project is about 10 years, but may take 11-12 years. 31 <br />2.) Cedar Ridge High School addition has a designer in place who is working with the 32 <br />planning committee on site visits, and all are excited about enhancements and 33 <br />different ways to offer programs. She said it is hoped that this will go out to bid in 34 <br />the fall, and be completed in August 2022. 35 <br /> 36 <br />James Barrett referred to the topic of efficiencies of these types of CIP investments, and 37 <br />said this year, as CHCCS does efficiency projects, it is putting ½ the money in a general pot 38 <br />and ½ back in an extra capital/reinvestment funds for longer term work going forward. 39 <br />Commissioner Rich said she went to an Information Technology meeting at Cedar 40 <br />Ridge, and there were places in school with no Wi-Fi. She asked if OCS is working on 41 <br />improving this for students, teachers and everyone else. 42 <br />Pam Jones said OCS knows there are dead spots, and Information Technology has 43 <br />reviewed it, but there is no answer right now. 44 <br />Commissioner Rich said a couple of Commissioners have discussed putting Wi-Fi on 45 <br />school buses, and she spoke with someone at Google to see what it is doing in South Carolina. 46 <br />She asked if there is any possibility of doing this so kids can do their homework on the bus. 47 <br />Todd Wirt said OCS uses Synovia to track buses, which also evaluates connectivity 48 <br />levels throughout the County based on the bus route. He said OCS is pulling this data to 49
The URL can be used to link to this page
Your browser does not support the video tag.