Browse
Search
Agenda - 02-17-2005-1a1
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2005
>
Agenda - 02-17-2005
>
Agenda - 02-17-2005-1a1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 9:00:56 AM
Creation date
8/29/2008 10:06:20 AM
Metadata
Fields
Template:
BOCC
Date
2/17/2005
Document Type
Agenda
Agenda Item
1a1
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f tq <br />~~-,. <br />Fairview Park and Public Campus <br />Draft Project Timetable <br />February, 2005 <br />October-December, 2004 Authorization to conduct topographic, biological and cultural <br />surveys of the site <br />November 2004 Memorandum of Agreement adopted by Town and County <br />January-March 2005 Surveys underway, members of Work Group solicited <br />Apri12005 Appointments made to Fairview Park and Campus Master <br />Plan Committee, Opportunities and Constraints staff report <br />prepazed <br />May 2005 Committee Meeting #1 (Opportunities and Constraints report <br />presented, initial facility/design ideas solicited) <br />June 2005 Committee Meeting #2 (Design charette) <br />August 2005 Committee Meeting #3 (Complete chazette /develop draft <br />recommendations/MasterPian) <br />September 2005 Committee Meeting #4 (Final meeting -recommendations <br />and Master Plan) <br />October-November 2005 Master Plan presented to County and Town BoC for <br />review/approval <br />November 2005? A proval of Master Plan <br />One month after Master <br />Plan Approval (MPA) Land swap reviewed and considered. County BOCC <br />approves submittal of site plan for pazk <br />3 months after MPA Site plan considered and approved by Town <br />8 months after MPA Park construction/biddocumenu prepared, bids solicited and <br />received <br />9 months after MPA Bid award to BOCC for action <br />10 months after MPA Pazk Construction begins <br />22 months after MPA Park opening (tentative) <br />Draft timetable, subject to change <br />
The URL can be used to link to this page
Your browser does not support the video tag.