Browse
Search
CHATPEC 111402
OrangeCountyNC
>
BOCC Archives
>
Advisory Boards and Work Groups - Inactive
>
Chapel Hill Township Park and Ed Campus Master Plan Work Group
>
Agendas
>
CHATPEC 111402
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2018 3:09:23 PM
Creation date
5/10/2018 3:08:56 PM
Metadata
Fields
Template:
BOCC
Date
11/14/2002
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lincoln Center, Merritt Mill Road <br />Chapel Hill, North Carolina 27516 <br />Telephone: (919) 967 -8211 <br />Neil G. Pedersen <br />Superintendent <br />Raymond J. Reitz <br />Chief Technology Officer <br />TO: Board of Education <br />FROM: Neil G. Pedersen <br />Superintendent <br />Nettie Collins -Hart, Assistant Superintendent <br />for Instructional Services <br />Steve Scroggs, Assistant Superintendent <br />for Support Services <br />SUBJECT: Issues Related to New Facilities <br />DATE: October 5, 2002 <br />At it's October 3rd meeting, the Board of Education clarified its position on several <br />issues related to planning for new education facilities. The resolution below has been <br />written to capture the consensus of the Board. It should be clearly stated from the outset, <br />however, that long -range facility planning is challenging in a community such as ours. We <br />must continually adjust to changes in enrollment trends; therefore, although these plans <br />reflect our best thinking based on current enrollment projections, they are subject to <br />change as conditions necessitate. <br />RESOLUTION <br />Be it, therefore, resolved that the Board of Education adopts the following statements as <br />the official position of the Board as it moves forward with the provision of adequate <br />facilities for its students and staff through the year 2010 -11: <br />The Board of Education, via this resolution, formally requests the Orange County <br />Board of County Commissioners (BOCC) to authorize the use of 2001 bond funds <br />originally associated with Elementary School No. 10 for a third high school. These <br />funds will be combined with funds from previously identified revenue sources to <br />build a comprehensive high school with a capacity as close to 1000 students as the <br />budget will permit. The projected budget,.based on currently available funds, is <br />approximately $28 million. The school will be located on the southern side of the <br />school district. The target opening date is 2005 -06 although it is recognized that <br />this will be a difficult deadline to meet. If possible, the site that is selected and the <br />M <br />
The URL can be used to link to this page
Your browser does not support the video tag.