Browse
Search
CHATPEC 111402
OrangeCountyNC
>
BOCC Archives
>
Advisory Boards and Work Groups - Inactive
>
Chapel Hill Township Park and Ed Campus Master Plan Work Group
>
Agendas
>
CHATPEC 111402
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2018 3:09:23 PM
Creation date
5/10/2018 3:08:56 PM
Metadata
Fields
Template:
BOCC
Date
11/14/2002
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
rAkWA <br />M <br />> No clear answer on powerline impacts (elect.romagnetics). Proximity to lines <br />is the key. Will look at data on subject. <br />➢ Will have children at these schools <br />Should be careful to preserve creek/slopes <br />> Pond is beautiful <br />➢ Thought saw an old roadbed on the property? <br />> Jones Creek bl6cked/disrupted by logging and storm debris <br />> School sites potential — many positives <br />➢ Need more detailed info on the building sites (soils, rock) on where we will <br />build. House is good condition. <br />> Challenge — preservation of important places, but construction also important. <br />> Must find preservation and development balance <br />> Size of site (193 acres) offers potential. Will need careful road siting. <br />➢ Site distances on Old NC 86 not good — safety issues <br />➢ Lot of potential in buildings. <br />> School groups should be able to utilize park and surrounding resources <br />➢ Equipment to enhance (educational possibilities?) <br />➢ Log cabin — a challenging issue <br />➢ Prime parcel for many playing fields <br />➢ Need to build green buildings already supportive of — merge the site's <br />possibilities into curriculum. Involve school students now in site work and <br />learning about the site. <br />Summary <br />➢ More info on powerline (access, electromagnetic) <br />➢ New aerials of site enlarged for future meetings <br />> Suitability of soils (rock) to be addressed as design proceeds <br />➢ Engage OWASA on different utility configurations - how does it affect <br />water/sewer. IS there flexibility in standards on placement of gravit sewer <br />lines along streams (offset). <br />> Consider opportunities to de-emphasize the road <br />
The URL can be used to link to this page
Your browser does not support the video tag.