Orange County NC Website
'Ilk <br />IIIJIIII�1111� _,!III V <br />11111il! 11111111`11 0 TD7ffNMM31R3WM2= <br />Because of the need for a "seamless transition" for the integrated master plan, it <br />is of critical importance that subcommittee share all relevant information about <br />work to date as soon as practical. <br />The closing segment of each regular meeting is designed for this dialogue, and <br />the Work Group may wish to consider whether additional time is needed to <br />ensure that interconnectedness and other consistencies between plans are being <br />addressed. In addition, liaisons may be designated from each subcommittee — <br />and the Co-Chairs may move from one subcommittee to another - to foster <br />communication with the other group. <br />