Orange County NC Website
3. A preferred type of service, starting August 2005 (County staff has proposed a choice <br />between a regular route or a 12-month demonstration project for the conceptual route), <br />with a starting date of August 2005. <br />4. The drafting of a proposed Memorandum of Understanding between Triangle Transit <br />Authority and Orange Public Transportation for route operation. <br />