Browse
Search
Agenda - 02-15-2005-7b
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2005
>
Agenda - 02-15-2005
>
Agenda - 02-15-2005-7b
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 8:53:21 AM
Creation date
8/29/2008 10:05:51 AM
Metadata
Fields
Template:
BOCC
Date
2/15/2005
Document Type
Agenda
Agenda Item
7b
Document Relationships
Minutes - 20050215
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange Water and Sewer Authority <br />Sewer Service Extension Regulations <br />Page 2 <br />~~ <br />plant. The interceptor sever is owned and maintained by <br />the Authority. <br />PUMP STATION. The pump station (also called lift sta- <br />tion) is the sewer appurtenance which pumps the waste- <br />water Erom a sewer main of. lower elevation to a sewer <br />main of higher elevation. <br />I~, ExTENSIOR OF SEWER HAIRS <br />Extension of sewer mains shall meet the following <br />requirements= <br />A. Approval By Local Government S Agencies <br />Prior to installation of any <br />cant for service shall provide to <br />cation and/or documentation that <br />to be served has been approved by <br />ical subdivision and/or regul: <br />review authority. , <br />B. Review By The Authority <br />facilities the appli- <br />the Authority certifi- <br />the proposed property <br />the appropriate polit- <br />itory agencies having <br />AL1 installations shall meet minimum specifications <br />set by the Authority. The' specifications shall include <br />the size of all lines, their location, grade, materia'l,s <br />used, manner of ins[allati;on and such other speciEica- <br />tions deemed necessary by the Authority. <br />C. Approval by Regulatory Agencies <br />Prior to approval by the Authority the construction <br />drawings and specifications for the extension of sewer <br />service must be submitted to and reviewed by the appro- <br />priate regulatory agencies;. These agencies may include <br />but are not limited to the~Department of Transportation, <br />the Division of Environmental Management, the Division <br />of Health Services, the Division of Land Resources and <br />the U.S. Army Corps of Engineers. <br />D. Approval 6y the Authority <br />Construction shall not commence until approval has <br />been given in writing by the Authority to specifications <br />shown on detailed construction drawings prepared for the <br />applicant by an engineer; registered in the State of <br />
The URL can be used to link to this page
Your browser does not support the video tag.