Browse
Search
Agenda - 02-15-2005-7b
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2005
>
Agenda - 02-15-2005
>
Agenda - 02-15-2005-7b
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 8:53:21 AM
Creation date
8/29/2008 10:05:51 AM
Metadata
Fields
Template:
BOCC
Date
2/15/2005
Document Type
Agenda
Agenda Item
7b
Document Relationships
Minutes - 20050215
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange Water and Sever Authority <br />Sewer Service Extension Regulations <br />Page 7 <br />i~ <br />service connection; provided, however, Chat in any <br />instance where satisfactory evidence shows that an <br />applicant Eor a connection has paid Che cost of instal- <br />lation of the main to which the connection is to be <br />made, either by installing the main at his expense and <br />then conveying same to the Authority Cor its predeces- <br />sors) or by reimbursing the Authority (or its predeces- <br />sors) for the cost of such main, the Footage Charge <br />shall be waived. <br />3. Computation <br />1. The Eootage charge shall be computed on the basis <br />of the footage of the property abutting the line. On <br />lots abutting two or more streets in which lines are <br />installed, Che footage shall be based upon the longest <br />side. <br />2. The minimum frontage for each connection shall be <br />that for property with 50 feet frontage, regardless of <br />actual frontage. <br />3. When a line passes thcough a tract which may be <br />served to either side from the line, the front footage <br />and acreage fees shall apply separately to each side. <br />D. Private Lateral Tap Charge <br />1. Purpose <br />The purpose of this charge is to recover costs of <br />making the tap into the sever main or mains and provid- <br />ing a connection point for the Lateral connection. Where <br />properties have been provided a stub out to the property <br />line, edge of easement or right of way no cap fee will <br />apply. Charges will be made for the cutting of a tap <br />into an existing sewer main or manhole. These charges <br />include all labor and materials to complete the physical <br />tap, but do not include cost for excavating, backfilling <br />or pavement repairs necessary to expose the main or <br />manhole. Obtaining and paying for the street cut permit <br />from units of local government or obtaining encroachment <br />approval from the Department of Transportation are the <br />responsibility of the applicant. <br />
The URL can be used to link to this page
Your browser does not support the video tag.