Browse
Search
Agenda - 02-15-2005-7b
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2005
>
Agenda - 02-15-2005
>
Agenda - 02-15-2005-7b
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 8:53:21 AM
Creation date
8/29/2008 10:05:51 AM
Metadata
Fields
Template:
BOCC
Date
2/15/2005
Document Type
Agenda
Agenda Item
7b
Document Relationships
Minutes - 20050215
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange Water and Sever Authority 15 <br />Sewer Service Extension Regulations <br />Page 4 <br />service i,s responsible for providing or securing the <br />necessary encroachments and easements requited for the <br />project. Easements necessary to serve the project and <br />allow for the orderly development and expansion of the <br />sewer system shall be dedicated in behalf of the Author- <br />ity. <br />G. ownership and Contcol <br />All sewer mains constructed and connected to the <br />facilities of the Authority under the policies stipulat- <br />ed herein shall be conveyed to and become the property <br />of the Authority upon completion and acceptance. Con- <br />nection to the system and acceptance by the Authority <br />shall constitute dedication of a sewer main extension by <br />the applicant but the applicant may be required to <br />furnish to the Authority documentation of specific <br />conveyance. <br />The Authority shall have exclusive control of all <br />such lines and shall be responsible for their mainte- <br />nance, repair and operation. <br />H. Warranty <br />The conveyor of an extension to the system shall <br />guarantee the entire project against defective material <br />and workmanship and con`sequen[ial damages resulting <br />therefrom for a period ofytwelve months from the date of <br />completion and acceptance~of the project, including such <br />incidental damages as ma,y arise from such claims. At <br />the completion of the construction and prior to accept- <br />ance of any fees for connection of service, the conveyor <br />must supply to the Auttiori[y a letter of credit in <br />behalf of the Authority !in an amount equal to SZ of the <br />total extension construction cost or such other amount <br />as the Authority may require. <br />I. System Expansion <br />Requirements herein~do not preclude the use and <br />extension of mains by the Authority 'for the expansion <br />and orderly development 'of the sewer system. The Au- <br />thority shall have the tight to make, or allow to be <br />made, additional extensions of a sewer main beyond or <br />laterally from the extension. <br />
The URL can be used to link to this page
Your browser does not support the video tag.