Browse
Search
Agenda - 02-15-2005-7b
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2005
>
Agenda - 02-15-2005
>
Agenda - 02-15-2005-7b
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 8:53:21 AM
Creation date
8/29/2008 10:05:51 AM
Metadata
Fields
Template:
BOCC
Date
2/15/2005
Document Type
Agenda
Agenda Item
7b
Document Relationships
Minutes - 20050215
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange Water and Sever Authority <br />Sewer Service Extension Regulations <br />Page 3 <br />i~ <br />Nozth Carolina. This approval wilt be granted by the <br />Authority after is has received notification of approval <br />by the various regulatory agencies. <br />E. Construction <br />The public main shall not be less than eight (S) <br />inches in diameter, must be laid to line and grade, with <br />manholes at any change of line and grade of the sever <br />and in no case more than 400' apart, and in all other <br />respects meet the specifications used by the Authority <br />for construction of sewer lines. <br />Any addition to the system must extend to the appli- <br />cant's property with adequate provisions including <br />easements, rights-oE-way, etc. for laterals or exten- <br />sions as required to support future development and <br />extension of the system. <br />Extension of sewer mains shall be performed by as <br />independent contractor under contract to the Authority <br />or to the applicant complying with the Authority's <br />Standards and Specifications for Water Distributions and <br />Wastewater Collections Systems with all work subject to <br />inspection and approval by the Chief Engineer or his <br />authorized agent. <br />If in the judgment of the Chief Engineer there is <br />demonstrated lack of competent supervision of a contrac- <br />tor, the Chief Engineer may, upon approval. of the Execu- <br />tive Director (1) halt work until approved supervision <br />is obtained and the work. performed in accordance with <br />approved specifications, or (2) provide constant con- <br />struction observation by Authority personnel at the <br />expense of the applicant. <br />The applicant is solely responsible for the design <br />and construction of the project. The applicant may be <br />required to modify, rearrange or redo any work to bring <br />it in conformity with the Authori.ty's Standards and <br />Specifications. Construction observation by the Author- <br />ity does not imply supervision and/or acceptance of the <br />work. <br />F. Rights-Of-Way <br />Sewer mains will be installed only in dedicated <br />streets, roadways, or rights-of-way secured by encroach- <br />ments or recorded easements or license. Applicant for <br />
The URL can be used to link to this page
Your browser does not support the video tag.