Orange County NC Website
Orange Gater and Sewer Authority <br />Sewer Extension Service Policy <br />Page 2 <br />1, The cost of installing all sewer system components within or <br />to a point which is adjacent to their property. <br />2. The costs of connecting sewer mains between their properties <br />and the existing wastewater collection system and/or improvement <br />of existing mains, pump stations and appurtenances. <br />3. The initial financing of service extensions both inside and <br />outside the property of the applic~an[ with reimbursement to the <br />applicant fot costs in excess of itheir'proportionate share as <br />provided by reimbursement policies of the Authority. <br />4. Providing easements and rights-of-way sufficient for the con- <br />struction, operation, repair and expansion of the sewer system, <br />including sufficient isolation from adjoining facilities within <br />or without the boundaries of such easement or right-of-way. <br />AIITHORIZATION The Executive Airector is authorized and empow- <br />ered to direct on behalf of the Orange Water and Sewer Authority <br />extension of sewer service as provided under this policy, to <br />establish regulations for the implementation of this policy and <br />without further authorization by tfie Board of Directors to take <br />administrative actions for the security and control of the system <br />of Orange Water and Sewer Authority. <br />The Executive Director is authorized to wi.[hhold or terminate <br />sewer service for noncompliance by the party with the policies <br />and regulations of the Authority, ilhere unusual circumstances <br />exist, the Executive Director may request that the Board of <br />Directors make the determination on extension of sever service or <br />extension of the sewer system. <br />Reviewed by General Counsel <br />Adopted by the Board: <br />~/~/90 <br />Date <br />1/25/90 <br />Date <br />