Orange County NC Website
Park/Center Pro'ects <br />Efland-Cheeks Park and Community Correct drainage on walking track <br />Center Install and establish plant materials for <br /> stabilization of embankment <br /> Run electric service to existing and new <br /> picnic shelters <br /> Clear dead and dawn limbs, limb up <br /> trees, clear undesirable undergrowth <br /> and chip behind play area and <br /> throughout picnic area. <br /> Improve soccer field grade (low area) <br /> with gradual top dressing treatment <br /> Renovate (replace) infield with <br /> contractual assistance <br />Homestead Communit Center Re air Si n <br />Fairview Park Clear and stabilize streams and culverts <br /> Stain play structure components <br /> Renovate Horseshoe Pits <br /> Install parking bumpers <br /> Re air and relocate Park Si n <br />Northern Recreation Center and Park Install directional signs <br /> Renovate warning track <br /> Develop Pottery/Ceramic Studio <br /> Clear and chip years of storm debris <br /> from existing trails <br /> Fill low areas, to dress to level field <br />Central Recreation Center Install and establish plant materials to <br /> replace screening <br /> Prepare area and facilitate the <br /> installation of play apparatus <br /> Install curbing and fencing around play <br /> area <br /> Renovate lantin beds <br />Southern Human Services Center Design and placement of trail signage <br /> and kiosk <br /> Continue construction and maintenance <br /> of trails <br />z <br />The position requested in this abstract would allow the department to address the unmet needs <br />related to the projects outlined in the above table. <br />FINANCIAL IMPACT: Based on a proposed start date of March 1, 2005, funding requirements <br />for fiscal year 2004-05 total $16,547, This amount includes $16,035 for salary and benefits, <br />and $512 in operating and one-time start-up costs, Estimated annual costs of the position for <br />FY 2005-06 is $47,430, which includes $46,505 in salary and benefits, and $925 in operational <br />costs. <br />Funding to cover the costs for the current fiscal year ($16,547) would come from the reserve <br />fund of $23,406 that the Board of Commissioners set aside in the 2004-05 fiscal year budget. <br />