2018-127-E AMS - Warren Hay replace roof top air handling units at 501 w franklin st
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-127-E AMS - Warren Hay replace roof top air handling units at 501 w franklin st
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2019 4:32:22 PM
Creation date
4/26/2018 4:58:02 PM
Metadata
Fields
Template:
Contract
Date
4/20/2018
Contract Starting Date
4/20/2018
Contract Ending Date
6/5/2018
Contract Document Type
Agreement - Construction
Amount
$70,185.00
Document Relationships
R 2018-127 AMS - Warren Hay Replace Roof Top Air Handling Units at 501 W. Franklin St
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: ACF53DOB- DE31- 493C- AC79- 4B38761278A7 <br />22 <br />sub - subcontractors, or their employees or agents, and shall make good such damages. The <br />Contractor shall be responsible for and pay for any such claims against the Owner. <br />7.16 The Contractor shall protect all landscaping designated to remain in the vicinity of the <br />operations and barricade all walks, roads, and areas as necessary to keep the public away from <br />the construction. <br />7.17 The Contractor shall provide cover and /or protect all portions of the Work and provide all <br />materials necessary to protect the Work whether performed by the Contractor or any of the <br />Subcontractors or sub - subcontractors. Any Work damaged through the lack of proper <br />protection, or from any other cause, shall be repaired or replaced without extra cost to the <br />Owner or extension to the Contract Time. <br />The Contractor shall maintain the Work during construction and until the Work is accepted. <br />This maintenance shall constitute continuous and effective effort prosecuted day by day, with <br />adequate equipment and forces so that the Work is maintained in satisfactory condition at all <br />times. All costs of maintenance shall be included in the Contract Price and the Contractor will <br />not be paid an additional amount for such effort. Should the Owner or Designer observe that the <br />Contractor at any time has failed to maintain the Work as provided herein, the Designer may <br />immediately notify the Contractor of such noncompliance. Such notification shall specify a <br />reasonable time within which the Contractor shall be required to remedy such unsatisfactory <br />maintenance condition. Should the Contractor fail to properly respond to the Designer's <br />notification, the Owner may, at the Contractor's expense, take such action as it may deem <br />appropriate to remedy the defective maintenance, including suspension of the Contractor's <br />Work or any part thereof. Any such expense incurred by the Owner shall be deducted from <br />monies due or to become due the Contractor. <br />Parking lots, streets, and walks connecting to the Project area shall be protected by the <br />Contractor from deposits of mud, sand, stone, litter, or debris in any form. Pedestrian traffic <br />areas around the construction limits must be maintained in a clean and safe condition at all <br />times with required barricades and covered walkways. When excavation or other operations <br />outside the Project limits is required, the Contractor shall, immediately following that work, <br />return the area to its original condition. <br />All catch basins and storm drain lines in the vicinity of the Project site shall be protected at <br />all times from entry of dirt, rubble and other debris. The residue from the cleaning of trucks, <br />wheelbarrows, concrete buggies, etc. must be prevented from entering the drainage <br />system, and if cleaning is done, the residue must be contained and removed from the <br />Project site with other refuse. <br />7.18 No burning of refuse or debris shall be allowed inside or around the Project during the <br />course of construction without written authority from authorities having jurisdiction and the <br />Owner. <br />7.19 The Contractor shall provide for and maintain necessary safety measures and safety <br />programs for the protection of all persons involved with the Work. Such measures and programs <br />shall include the requirements of the most current edition of the CAGC Safety and Health <br />Manual [or the AGC Accident Prevention Manual in Construction], or equivalent requirements, <br />and shall fully comply with all Federal, State, and local laws, rules, regulations, and building <br />Revised 10/17 <br />