Orange County NC Website
DocuSign Envelope ID: ACF53DOB- DE31- 493C- AC79- 4B38761278A7 <br />and their approval by the Designer shall be a condition precedent to approval by the Designer of <br />each monthly Request for Payment. Said record copy shall be stored at the Project and fully <br />protected from damage by fire or other hazard. This record copy shall be available to the <br />Designer and Owner for inspection at all times and shall be delivered to the Designer for the <br />Owner's purposes prior to the Designer's certifying Substantial Completion of the Work. <br />6.6 At completion of the Project and before Final Payment, the Contractor shall assemble and <br />deliver to the Owner one complete set of all as -built drawings and one complete set of all <br />approved submittals, product data, and samples which were reviewed by the Designer. These <br />drawings and submittals shall be on paper, or in electronic or other media if required by the <br />Supplementary Conditions. These drawings and submittals shall be categorized and packaged <br />as directed by the Designer. <br />ARTICLE 7. CONTRACTOR <br />7.1 The Contractor shall supervise and direct the Work efficiently and with the Contractor's best <br />skill and attention. Except as may be set forth specifically in the Contract Documents, the <br />Contractor shall be solely responsible for the means, methods, techniques, sequences, and <br />procedures of construction, and for safety precautions and programs in connection with the <br />Work. The Contractor shall be responsible to see that the finished Work complies accurately <br />with the Contract Documents. <br />7.2 The Contractor shall appoint a Project Manager and shall keep on the Project at all times <br />during its progress a competent Resident Superintendent and necessary assistants who shall <br />not be replaced without prior written approval by the Owner except under extraordinary <br />circumstances, in which event immediate written notice shall be given to the Designer and the <br />Owner. The Project Manager and the Resident Superintendent may be the same person or <br />different persons. At any time, the Owner, in its sole and absolute discretion, may require the <br />Contractor to replace the Project Manager or Resident Superintendent with an experienced and <br />competent person or persons upon seven (7) days written notice from the Owner to the <br />Contractor. Such replacement shall be at the Contractor's expense and at no cost to the Owner. <br />Both the Project Manager and the Resident Superintendent shall have authority to act on behalf <br />of the Contractor, and instructions, directions or notices given to either of them shall be as <br />binding as if given to the Contractor. <br />7.3 The Contractor shall provide sufficient competent and suitably qualified personnel, <br />equipment, and supplies to lay out the Work and perform construction as required by the <br />Contract Documents. The Contractor will at all times maintain good discipline and order at the <br />site, and will comply with all applicable OSHA standards. <br />Any person employed by the Contractor, any Subcontractor, or any sub - subcontractor who, in <br />the opinion of the Designer or the Owner, does not perform his Work in a proper and skillful <br />manner or is intemperate or disorderly shall, at the written request of the Owner or Designer, be <br />removed forthwith by the Contractor, Subcontractor, or sub - subcontractor employing such <br />person without cost to the Owner, and shall not be employed again in any portion of the Work <br />without the written approval of the Owner or Designer. <br />Should the Contractor fail to remove such person or persons or fail to furnish suitable and <br />sufficient personnel for the proper prosecution of the Work within three (3) days after written <br />Revised 10/17 <br />