Browse
Search
2018-127-E AMS - Warren Hay replace roof top air handling units at 501 w franklin st
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-127-E AMS - Warren Hay replace roof top air handling units at 501 w franklin st
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2019 4:32:22 PM
Creation date
4/26/2018 4:58:02 PM
Metadata
Fields
Template:
Contract
Date
4/20/2018
Contract Starting Date
4/20/2018
Contract Ending Date
6/5/2018
Contract Document Type
Agreement - Construction
Amount
$70,185.00
Document Relationships
R 2018-127 AMS - Warren Hay Replace Roof Top Air Handling Units at 501 W. Franklin St
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: ACF53DOB- DE31- 493C- AC79- 4B38761278A7 <br />l� <br />make such request sufficiently in advance of such date as to avoid any such delay. The <br />Designer shall respond in writing to the Request for Information by the date stated by the <br />Contractor unless he cannot reasonably do so, in which case he shall prior to that date notify <br />the Contractor of the date by which he can reasonably respond. The Contractor shall not be <br />entitled to any additional time for the completion of the Work or any portion thereof by reason of <br />the Designer's failure to respond if he has not submitted his Request for Information sufficiently <br />in advance to allow the Designer a reasonable time within which to respond. <br />1.33 Request for Payment - The form, in the form of AIA Document G702 (latest ed.) or other <br />published document approved by Owner, which is to be used by the Contractor in requesting <br />progress payments and which is to include a Schedule of Values as required by the Contract <br />Documents and an affidavit of the Contractor that progress payments theretofore received from <br />the Owner on account of the Work have been applied by the Contractor to discharge in full all <br />the Contractor's obligations incurred in connection with Work covered by all prior applications for <br />payment. See paragraph 20.2. <br />1.34 Resident Superintendent - That person designated by the Contractor in accordance with <br />paragraph 7.2 who has day -to -day responsibility for the prosecution of the Work and the <br />obtaining of proper materials and equipment, and adequate labor and who shall have the <br />authority set forth in the last sentence of paragraph 7.2. <br />1.35 Schedule of Values - Any breakdown of the Contract Price which may be required by the <br />Contract Documents, and designated as such. See paragraph 20.1. <br />1.36 Specifications - That portion of the Contract Documents consisting generally of the written <br />requirements for materials, equipment, construction systems, standards, and workmanship for <br />the Work and performance of related services. <br />1.37 Subcontractor - A person, firm, or corporation who has entered into a direct contract with <br />the Contractor to perform any of the Work at the Project. <br />1.38 Submittal - Shop drawings, product data, samples, and other documents required by the <br />Contract Documents to be submitted by the Contractor to the Designer. <br />1.39 Submittal Register - See paragraph 13.2 of these General Conditions. <br />1.40 Substantial Completion - The point at which the Work, and Work by other Contractors on or <br />in connection with the Project, as determined by the Designer, is sufficiently complete in <br />accordance with the Contract Documents that it can be beneficially occupied by the Owner, and <br />the Work can be utilized by the Owner for its intended use, and all necessary permits and <br />permissions for Beneficial Occupancy and utilization having been obtained by the Contractor. All <br />operations and maintenance manuals, Owner training, and as -built drawings must be submitted <br />prior to Substantial Completion being achieved. <br />1.41 Sub - subcontractor - A person or entity that has a direct or indirect contract with a <br />Subcontractor to perform any of the Work at the Project. <br />Revised 10/17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.