Browse
Search
2018-127-E AMS - Warren Hay replace roof top air handling units at 501 w franklin st
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-127-E AMS - Warren Hay replace roof top air handling units at 501 w franklin st
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2019 4:32:22 PM
Creation date
4/26/2018 4:58:02 PM
Metadata
Fields
Template:
Contract
Date
4/20/2018
Contract Starting Date
4/20/2018
Contract Ending Date
6/5/2018
Contract Document Type
Agreement - Construction
Amount
$70,185.00
Document Relationships
R 2018-127 AMS - Warren Hay Replace Roof Top Air Handling Units at 501 W. Franklin St
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: ACF53DOB- DE31- 493C- AC79- 4B38761278A7 <br />4 <br />1.13 Contract Time - The number of calendar days stated in, or computed from, the Contract <br />Documents for the completion of the Work, or any portion thereof. See, particularly, Article 13 <br />hereof and the Contract Construction Schedule. Time of completion as specified therein is of the <br />essence. The time used and referred to on the Project will be that time which is observed in <br />Raleigh, North Carolina, being Eastern Daylight Savings Time (EDT), Eastern Standard Time <br />(EST), or other as designated by the Designer. <br />1.14 Contractor - The Contractor shall be that party identified as such in the Contract <br />Documents. <br />1.15 Days - Unless otherwise indicated, the term "days" shall mean consecutive calendar days. <br />1.16 Daylight Hours - The hours or portions of hours between sunrise and sunset local time. <br />1.17 Designer(s) — The person or firm designated as the Designer in the Contract Documents, <br />or their authorized representatives. The Designer(s), as referred to herein, shall mean architect, <br />landscape architect, and /or engineer. They will be referred to hereinafter as if each were of the <br />singular number and masculine gender. On projects for which there is no Designer designated <br />references to approvals or authorizations of or by the Designer shall be interpreted to refer to <br />approvals or authorizations of Owner or Owner's designee. <br />1.18 Drawings - The Drawings are the graphic and pictorial portions of the Contract Documents, <br />wherever located and whenever issued, showing the design, location, and dimensions of the <br />Work, and generally including plans, elevations, sections, details, schedules and diagrams. A <br />list of the Drawings is contained in the Contract Documents. <br />1.19 Field Order - A written order issued by the Designer which clarifies or interprets the <br />Contract Documents or orders minor changes in the Work in accordance with the Contract <br />Documents. See paragraph 14.2. <br />1.20 Final Completion - The point at which the Contractor has completed the Work, with the <br />exception of guaranty and warranty obligations and as determined by the Designer and <br />becomes entitled to final payment upon the recommendation of the Designer and determination <br />by the Owner. <br />1.21 The words "furnish," "furnish and install," "install," and "provide" or words with similar <br />meanings shall be interpreted, unless otherwise stated, to mean furnish and install complete, in <br />place and ready for service. <br />1.22 Liquidated Damages — See paragraph 13.18 of these General Conditions. <br />1.23 Modification - (A) a written amendment to the Contract Documents signed by the Owner <br />and the Contractor and identified therein as such, (B) a Change Order, (C) Construction <br />Change Directive, or (D) a Field Order. A Modification may only be issued after execution of the <br />Agreement. <br />1.24 Notice of Award - The written notice by the Owner to the Contractor that the Contractor is <br />the successful Bidder and that upon compliance with the conditions precedent to be fulfilled by <br />Revised 10/17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.