Browse
Search
2018-127-E AMS - Warren Hay replace roof top air handling units at 501 w franklin st
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-127-E AMS - Warren Hay replace roof top air handling units at 501 w franklin st
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2019 4:32:22 PM
Creation date
4/26/2018 4:58:02 PM
Metadata
Fields
Template:
Contract
Date
4/20/2018
Contract Starting Date
4/20/2018
Contract Ending Date
6/5/2018
Contract Document Type
Agreement - Construction
Amount
$70,185.00
Document Relationships
R 2018-127 AMS - Warren Hay Replace Roof Top Air Handling Units at 501 W. Franklin St
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: ACF53DOB- DE31- 493C- AC79- 4B38761278A7 <br />ARTICLE 1. DEFINITIONS <br />1.1 Agreement - The Construction Contract, these General Conditions, and any Supplementary <br />Conditions. <br />1.2 AIA - The American Institute of Architects. <br />1.3 ASTM - The American Society for Testing and Materials. <br />1.4 Beneficial Occupancy — Use of the Project by the Owner after Substantial Completion, but <br />prior to Final Completion.. <br />1.5 Change Order - A written order to the Contractor signed by the Owner and the Designer <br />authorizing an addition, deletion, or revision in the Work and /or an adjustment in the Contract <br />Price and /or the Contract Time issued after execution of the Construction Contract. See <br />paragraph 14.1. <br />1.6 Completion Date - Those dates identified as Completion Dates in the Contract Construction <br />Schedule or elsewhere in the Contract Documents. <br />1.7 Construction Contract — The document executed by the Contractor and the Owner to <br />formally memorialize their consent to the terms of the Agreement. <br />1.8 Construction Change Directive — A written order to the Contractor signed by the Owner and <br />the Designer directing an addition, deletion, or revision in the Work after execution of the <br />Construction Contract, in circumstances when the parties have been unable to agree on an <br />adjustment to the Contract Price or the Contract Time, but the Owner requests that the <br />Contractor proceed with said addition, deletion, or revision in the Work subject to adjustment of <br />the Contract Price and /orContract Time under the procedures described herein. <br />1.9 Construction Manager(s) - The person(s) or firm designated as the Construction Manager in <br />the Contract Documents, or their authorized representatives. The Construction Manager(s), as <br />referred to herein, will be referred to hereinafter as if each were of the singular number and <br />masculine gender. <br />1.10 Contract Construction Schedule - That schedule described in Article 13 hereof and <br />identified as the Contract Construction Schedule. <br />1.11 Contract Documents - All of the documents that make up the Agreement, plus the <br />Drawings and Specifications that describe the scope of the Work, plus allowable Modifications <br />to the Contract Documents. <br />1.12 Contract Price - The total monies payable to the Contractor under the Contract Documents <br />pursuant to paragraph 15.1 of the Agreement. <br />Revised 10/17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.