Browse
Search
2018-127-E AMS - Warren Hay replace roof top air handling units at 501 w franklin st
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-127-E AMS - Warren Hay replace roof top air handling units at 501 w franklin st
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2019 4:32:22 PM
Creation date
4/26/2018 4:58:02 PM
Metadata
Fields
Template:
Contract
Date
4/20/2018
Contract Starting Date
4/20/2018
Contract Ending Date
6/5/2018
Contract Document Type
Agreement - Construction
Amount
$70,185.00
Document Relationships
R 2018-127 AMS - Warren Hay Replace Roof Top Air Handling Units at 501 W. Franklin St
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: ACF53DOB- DE31- 493C- AC79- 4B38761278A7 <br />[Departmental Use Only] <br />TITLE 501 W. Franklin HVAC <br />FY 2017 -18 <br />NORTH CAROLINA <br />CONSTRUCTION AGREEMENT UNDER $250,000.00 <br />ORANGE COUNTY <br />THIS CONSTRUCTION AGREEMENT (hereinafter called "Agreement "), made as of the 20th <br />day of April, 2018, by and between Warren Hay Mechanical Contractors, Inc, (hereinafter called the <br />"Contractor "), and Orange County, a body politic and a political subdivision of the State of North <br />Carolina, (hereinafter called the "Owner "). <br />WITNESSETH: <br />That the Contractor and the Owner, for the consideration herein named, agree as follows: <br />1. CONTRACT DOCUMENTS; PRIORITY <br />The Contract Documents consist of this Agreement, the Request for Proposals, Proposal, <br />Construction Drawings, and Written Specifications. The Contract Documents form the Contract. In the <br />event of any inconsistency between or among the Contract Documents the Contract Documents shall be <br />interpreted in the following order of priority: <br />a. This Agreement. <br />b. Designer Approved Bulletins and/or Field Orders. <br />c. Request for Proposals and addenda thereto. <br />d. Proposal. <br />2. SCOPE OF WORK <br />The Contractor shall furnish and deliver all of the materials, and perform all of the work <br />required by this Agreement within the time period stipulated in a written Notice -to- Proceed to be <br />executed by the Contractor and Owner and in accordance with the following enumerated documents, <br />which are made a part hereof as if fully contained herein: <br />a. Construction Drawings prepared by Reece, Noland & McElrath, Inc. (Sheet ME0.1, <br />ME 1. 1, ME2.1 dated February 26, 2018) <br />b. Written specifications prepared by the project engineer. <br />c. Warren Hay Mechanical Contractors Inc proposal dated April 4, 2018 which fully <br />describes the work to be performed. Such work will hereafter be called the "Work ". <br />d. Related documents listed under Section 1 above. <br />Revised 10/17 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.