Orange County NC Website
29 <br /> <br />o One (1) Animal Services Vehicle Remount 1 <br />o Two (2) Emergency Services Ambulance Remounts 2 <br /> 3 <br /> 4 <br />Solid Waste Proprietary Projects (FY 2018-19): 5 <br />• Recycling and Sanitation Vehicles & Equipment - $1,155,387 (pages 80-81,86) 6 <br />Project Description/Justification: The Department follows the same process described above in 7 <br />the Environmental Support Equipment Replacement section for evaluating and replacing 8 <br />equipment. 9 <br />Current Year (2017-18) 10 <br />Waste & Recycling Center Stationary Compactors $214,000 Eight (8) stationary compactors 11 <br />replacing current front-loading and roll-off containers at the Eubanks Road W&R Center. 12 <br />Replacement of # 679, Dump Truck, deferred to FY 2019-2020. 13 <br />Year 1 (2018-19) 14 <br />Replace # 844, Hook Lift Truck, $251,790 15 <br />Year 2 (2019-20) 16 <br />Replace # 679, Dump Truck, previously deferred in FY 2017-18, $171,414; 17 <br />Replace #881, Front End Loader, $359,832 18 <br />Year 3 (2020-21) 19 <br />Replace #922, Hook Lift Truck, and #927, Hook Lift Truck, ($260,952 each) $521,904 20 <br />Year 4 (2021-22) 21 <br />No capital vehicles replacement scheduled. 22 <br />Year 5 (2022-23) Replace #959, Front End Loader, $395,052 23 <br />Years 6-10 - $2,011,526 FY 2023-24 24 <br />Replace Hook Lift Truck, $289,996 FY 2025-26 25 <br />Replace Hook Lift Truck, $354,294 FY 2026-27 26 <br />Replace Dump Truck, $162,400; Front End Loader, $506,320; (2) Hook Lift Trucks ($349,218 27 <br />each) $698,436 28 <br /> 29 <br />FY2018-23 Recommended Capital Investment Plan 30 <br />Solid Waste 31 <br />• Solid Waste Projects (p. 79-86) 32 <br />o Equipment Replacement - $745,387 33 <br /> Hook Lift Truck - $251,790 34 <br /> Multi-Family Truck - $281,991 35 <br /> Rear Load Compacting Truck (New) - $211,606 36 <br /> 37 <br />• High Rock Road Waste & Recycling Center - $676,428 (page 82) 38 <br />Project Description/Justification: Improvements to the High Rock Road Waste and Recycling 39 <br />Center include the modernization of the High Rock Road Center into a Neighborhood Center 40 <br />($676,428). Construction of the site was deferred from current year to Year 1 due to the 41 <br />possibility of site closure overlapping with the completion of the Eubanks Road facility. Costs 42 <br />have been revised and updated, and the site is projected to open July 2019. 43 <br /> 44 <br />As a Neighborhood Center, services will be modified as larger bulky materials, metal, yard 45 <br />waste, tires, clean wood, and white goods will no longer be accepted. Smaller bulky materials 46 <br />which will fit into the household waste compactor will continue to be accepted. The salvage 47 <br />shed, waste oil, oil filters, wet & dry cell batteries and electronics will also remain. Plastic film, 48 <br />textiles, cooking oil and food waste recycling programs will be added. 49 <br /> 50